Orange County NC Website
58 <br />General Engineering and Environmental Management Services <br />17Zi }J��i� 1u1 <br />Organization Chart <br />HDR's team of professional planners, scientists, and engineers has been assembled to provide the full range of skills <br />necessary to successfully support waste management engineering services and associated regulatory requirements. <br />We offer an organized and highly qualified group of professionals, with extensive experience on similar projects, who are <br />prepared to begin the work promptly. <br />Project Principal Project Director Quality Control /Quality Assurance <br />Robert J. Rella, PE, Joseph C. Readling, PE Eric A. Wright, PE <br />Senior Vice President Vice President Professional Associate <br />Landfill Services <br />Waste Reduction /Recycles. <br />Materials Recovery <br />Convenience Centers <br />* Doug DeCesare, PE <br />* Ruth Abbe <br />Tom Yanoschak, PE <br />Jim'Frey, RRS <br />* Ed Shuffles PE <br />Eric Wright, PE <br />Aaron Burman, RRS <br />Michelle Leonard <br />Kerry Sandford, RRS <br />LFG /Renewable Energy <br />- <br />Collection /Fleet <br />Regulatory Liaison <br />* Carlo Lebron, PE <br />* Dale James <br />* Joe Readling, PE <br />Brian Bird, PE <br />Allison Trulock <br />Ed Shuffierr, PE <br />Garrett Williams, El <br />Sarah Futrell, El <br />Doug DeCesare, PE <br />Compliance /Mitigation/ <br />Construction Administration <br />Facility Planning /Design <br />Hydrogeology <br />* Dean Ferry, CET <br />* Bob Rella, PE <br />* Mike Plummer, PE <br />Philip Westmoreland, PE <br />Ed Shuffler, PE <br />Aaron White, PG <br />Laura Patterson, El <br />Glenn Gray,AIA - Architectural <br />Brad Stone, PE <br />Henry Antshel, PE - Structural <br />Alternative Technology <br />Joel Johnson, PE - Mechanical <br />Mark Atkinson, PE - Electrical <br />* Bob Rella, PE <br />Michael Greenberg <br />Denotes Lead Team Member for each category of project. <br />Below are brief biographical sketches of members of the project team as identified on the Organization Chart. Full <br />resumes of select project team members are provided in the Resume section at the end of our qualification Statement. <br />Page 43 Fl <br />