Browse
Search
Minutes - 19830104
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1983
>
Minutes - 19830104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 8:44:12 AM
Creation date
8/13/2008 12:35:50 PM
Metadata
Fields
Template:
BOCC
Date
1/4/1983
Meeting Type
Regular Meeting
Document Type
Minutes
Document Relationships
Agenda - 01-04-1983
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.0 <br /> The Planning Staff feels that there is a preponderance of evidence to indicate <br /> substantial compLiance with the General, Standards and specific rules governing <br /> the Planned—Development—office—institutional, Class A Special Use Permit. The <br /> Planning Staff recommends approval of the request, with the fallowi <br /> conditions: ng imposed <br /> 1. That• all signs for the development shall be according to. Section 7'. 16 <br /> and Article 9 of the Zoning Ordinance. <br /> Z. Drainage, Soil erosion and sedimentation plans shall be reviewed and <br /> approved by Orange County. The installation of control devices and <br /> bn going construction work shall. be inspected. by Orange County. The <br /> site shall at all times be- in conformance with the Sail Erasion and <br /> Sedimentation Control Ordinance. <br /> 3. That the proposed dumpster be, placed orr a 10' x 20' concrete pad 6" <br /> thick,, with wire mesh. <br /> 4.. That the service entrance. from MC--86 to- the entrance gate into the storage <br /> yard be paved to N.'-C. Department of Transportation Secondary road scan- <br /> dards. <br /> S'. That the developer mark the 100' buffer an the perimeter of the site and <br /> take precautions to insure that the grading contractor does not disturb <br /> the area.. <br /> 6. The final. site plan; and narrative of the project incorporating all changes, <br /> deletions and additions through, the final am <br /> pxovaL of the o.roject are in- <br /> corporated herein: and made mart of the Special Use ?ermlt. A copy of the <br /> final. site- play and narrative are to be maintained on €i Le. with the Orange <br /> County Planning. Department. Only those uses specified in the project <br /> narrative a-ad. ov- the site plan, including but not necessarily L;mited <br /> to the officas,. warehousing, maintenance- service and outside storage <br /> Of utility materials will be permitted at the of€ice €aciLity. A11 <br /> improvements as indicated shall be constructed according co the consturc- <br /> tiorx schedule. set forth, i - this. per=t. <br /> 7. The following construction, schedule shall be adhered to by the applicant. <br /> Construction shall begin within six months of the. issuance of the Special <br /> Use Permit. <br /> 8. 311 necassary- easement ca permit utility (electri.citq, telephone, sewer <br /> and. water) installation, servicing and hookups cc the development shall <br /> be provided at no cost. to the utility- provider. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.