Browse
Search
S Park & Rec- Hillsborough Fairview Park, Co Parks Operations Base & Public Works Facilities - Land Swap
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Park & Rec- Hillsborough Fairview Park, Co Parks Operations Base & Public Works Facilities - Land Swap
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2013 4:51:22 PM
Creation date
5/12/2010 9:25:01 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Meeting Type
Regular Meeting
Document Type
MOU
Agenda Item
5t
Document Relationships
Agenda - 01-23-2007-5t
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 01-23-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />A. CHARGE to the Master Plan Committee: <br />Develop a Master Plan for the Site, within the framework of any operating guidelines or <br />other instructions as offered by the elected Boards, to include the following. <br />1. A map of the Site with the design for the Fairview Park, including proposed <br />buildings, playing fields, roads, parking, trails, other facilities, amenities, <br />infrastructure locations, vegetative cover, hydrology and other components that <br />are commonly included in a park or public facility concept plan. The map of the <br />Site shall include existing and planned buildings of the County Parks Operations <br />Base and the Town and County Public Works facilities. Planning of the County <br />Parks Operations Base and the Town and County Public Works facilities is <br />limited to the location of buildings, roads, parking and other infrastructure. <br />2. A written report outlining the proposed uses, the design rationale, description of <br />work group process, natural and cultural features, means of soliciting community <br />input, the potential future phases, and construction cost estimates. If needed, the <br />report should also include a phasing plan, showing how the Fairview Park and <br />other public facilities could be developed over time *in a cost- efficient fashion. <br />The report should include a recommendation concerning which facilities should <br />be constructed, utilizing the funds remaining from the $850,000 allocated for the <br />pmject after the planning, design, and survey work (estimated to cost $200,000) <br />have been completed. <br />3. The report should address and recognize the limitations imposed by safety <br />considerations caused by the Fairview park site's previous use for waste - disposal, <br />as addressed in part by a geo- technical report prepared in 1999 ( "Report of <br />Geotechnical Evaluation, Closed Hillsborough Landfill Site, July 19, 2000'). <br />Further recommendations may be needed to address phased remediation of <br />portions of the Fairview park site. <br />4. The Master Plan should address co- location of existing and future public facilities <br />and provide for a synergy and compatibility of uses between park functions and <br />other public functions wherever possible. The rights of neighbors should be <br />respected by buffering incompatible uses. <br />5. The Committee should review the "old" 1988 Fairview Park Concept Plan as part <br />of the Master Plan and determine its validity, if any. <br />Product: A Master Plan report and map, as described above. <br />Timeframe for Product: by September, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.