Browse
Search
Minutes - 19820708
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1982
>
Minutes - 19820708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2013 12:35:38 PM
Creation date
8/13/2008 12:34:43 PM
Metadata
Fields
Template:
BOCC
Date
7/8/1982
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
__._-.-... i ._____..,~...~ <br />-.~ .. <br />Mr. Lee Mahler, Architect working for Buck Mountain Development Corporation, <br />made the presentation for the developers on the Class A Special Use Permit Request <br />for Midway Airport. <br />~ Mr. Mahler began by saying this was a "scaled down" version of the original <br />i <br />request since the office park had been eliminated and that the airport'portion• <br />was "essentially" the same as had been presented earlier. Ne noted some changes: <br />the runway has been shortened to 4,000'; overrun areas a5 an additional safety <br />feature were reached as the result of a "compromise" with Planning; and that <br />i <br />additional housing for 276 aircraft was provided for those that "could possibly <br />be hangared" in three phases. Mr. Mahler listed letters he'had received from the <br />Sheriff's Department and Mr. Bobby Baker saying the respective emergency services <br />could be provided; a letter from Department of Transportation saying there were no <br />road problems as a result of this project; a letter .from Mr. Bruce Matthews detailing <br />noise calculations; a letter from Mr. Willard Plentl saying there were no. problems <br />from the FAA's standpoint, Midway is in compliance with its requirements fora basic <br />utility airport; requested land ownership•dacuments; and an additional letter from <br />Mr. Plentltato Mr. Polatty contesting some of the County's requirements. (Those <br />documents are.on pages5~i(-55~jS~~i f this book.) <br />Mr. Mahler continued with the conditions which are recommended by the Panning <br />Staff: Conditions 1-11 are "acceptable to the owners;" he said revised drawings <br />dated. June 29, 1982, eliminate # 1D; #12, Mr. Mahler:said, was the only one they <br />"called into question at all" and it was the question of reasonable approach zone. <br />At this point Mr. Mahler read the letter from Mr. Plentl of the Department of Trans- <br />portation, Division of Aviation which questioned the County's requirement in this <br />matter. (see page~~f this book). Mr. Mahler said the developer would like # <br />12 to be changed to control of the 1,000' dimension.. Mr. Mahler contended that there <br />was no other airport that he knew of that had an equivalent area control requirement. <br />Mr. Mahler noted that the developers had considered what the Board of Commissioners <br />had asked for during the previous hearings and that they have "adhered in every <br />way to -. the Orange County Zoning Ordinance and the FAA standards." Mr. Mahler <br />requested approval of this project. <br />Commissioner Whitted asked Mr. Mahler to clear up the discrepancy in the number <br />of vehicular trips per day estimated to be generated 6y Midway. He specifcally <br />i referred to the Letter from Mr. Matthews which Mr. Cannity read (previously :cited). <br />
The URL can be used to link to this page
Your browser does not support the video tag.