Orange County NC Website
~k3 <br />Matt Solomon <br />{rom: Trish McMi{lan [jcpiedplbg@yahoo.com] <br />went: Friday, April 24, 2009 8:33 AM <br />To: Matt Solomon <br />Subject: Hillsborough Commons Phase 1 <br />Change Order Request: <br />6" sewer is not as shown on existing plans. The 4" sewer goes on through to the Dollar Tree and then outside of <br />building to the the new tap. The original plan was to install <br />60ft. 6" and tap into existing manhole. Now we must go father up the building and enter into current space that <br />new work is being done. <br />Additiona160ft. 6" PVC Sewer @ 20.00 per ft .................................$1,200.00 <br />We Will Saw Cut and Remove All Asphalt. <br />**Replacement By Others** <br />**No Allowance Included for Encountereing Rock or Existing Parking Lot <br />