Browse
Search
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 8:46:43 AM
Creation date
5/5/2010 10:21:02 AM
Metadata
Fields
Template:
BOCC
Date
4/21/2009
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Agenda - 04-21-2009 - 4r
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 04-21-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#F43 <br />WARREN -HAY <br />Mechanical Contractors Inc. <br />Heating and Air Conditioning <br />P.O. Box 818 • Hillsborough, NC 27278 <br />919-732-4362 <br />919-732-8660 Fax <br />State License #7211 <br />October 19, 2009 <br />Resolute Building Company <br />Re: Hillsborough Commons (Orange Countv Department of Social Serviced <br />CHANGE ORDER REQUEST #5 <br />We hereby submit specifications and estimates for: As allows: <br />• Provide & install (1) Carrier 10-ton unit as follows to replace existing Cooling <br />only RTU # 1 (Lennox) unit. <br />* * * * * * * *Premium Efficiency, Packaged roof top with CCN controls, Nominal 10-tons <br />cooling, 460-3-60, Powered 115V GFI convenience outlet includes outlet assembly, <br />transformer and wiring, non fused disconnect, integrated geaz driven economizer with <br />outdoor single enthalpy sensor, power exhaust, standazd operation down to 0 degrees, <br />hinged panels, mere-8 pleated filters (2"), comfort link controls with visual scrolling <br />marquee display, return air smoke detector, fan and filter switches, low range motor / <br />drive with vertical SARA and phase loss, AUCU cond and evap, space temp, W/ <br />occupancy override and set point adjustment slide bar, standard 14" roof curb. <br />• Provide crane & rigging to set new unit. (Will use crane that is setting 15-ton) to <br />remove existing unit so that curb can be put in place /installed by GC. <br />Total Change Order Costs: $16.863.00 <br />The above is based on the same options of other units instclled <br />Fcctorv lend-timc currently is 6-8 weeks <br />
The URL can be used to link to this page
Your browser does not support the video tag.