Orange County NC Website
12/02/2009 16:07 9194890435 WASPCO COR <br />~ ~Z <br />1MASPCO Corp. <br />Hillsborough Commons DSS Upfit <br />12/?J2009 <br />DESCRIPTION of CHANGE: Exterior insulation ~ entry and cover Dow board above <br />ceilings. Also included are added vents at ext. soffits <br />MATEFt1Al COSTS <br />Direct Cost of Materials <br />Sales Taxi 6.7500°~ <br />Shipping <br />Subtotal of Material Cost <br />15% OH&P <br />$2,5ss.as <br />$175.26 <br />$110.00 <br />$2,881.75 <br />$432.26 $3,314.02 <br />EQUIPMENT COSTS <br />15°~ OH~P <br />LABOR COSTS <br />38°i6 Labor Burden <br />Subto~l Labor <br />15°!o OH&P <br />SUBCONTRACTOR COSTS <br />08% OH&P <br />$s79.4a <br />$131.92 $1,011,40 <br />$4,752.00 <br />_ _$1,805.76 <br />$6,557.76 <br />$983.66 $7,541.42 <br />$.T. 672.00 <br />$53.76 $725.76 <br />PAGE 02/10 <br />PROPOSAL TOTAL AMOUNT $12,592.60 <br />