Orange County NC Website
09/01/2009 08:47 9194890435 <br />-{-WA2SPCO CDR <br />'L't J <br />COST BREAKDOWN WORKSHEET <br />WASPCO Corporation <br />9-1-09 DSS upfit <br />PAGE 03/03 <br />IWATERIAL COST <br />ltem Quanti <br />Framin with Studs 672 S <br />Unit Price Amount <br />0.25 $168.00 <br /> <br />Shots <br />60 <br />0.28 $0.00 <br />$16.80 <br />Screws 2000 0.015 $30.00 <br />5/8" D all 1305 0.195 $254.48 <br />Joint com ound 4 12.5 $50.00 <br />Joint tae 2 2.2 $4.40 <br />Metal atches electrical boxes 8 3.2 $25.60 <br />093 Control Joint 14 1.5 $21.00 <br /> $0.00 <br />$0.00 <br /> $0.00 <br />Total Material Costs $570.28 <br />EQUIP MENT RENTAL COSTS <br />Item Quanti Unit Price Amount <br />Truck Use 1 45 $45.00 <br />Scaffoldin / Pali rotection 1 17 $17.00 <br /> $0.00 <br /> $0.00 <br /> $o.oo <br />Total E ui ment Costs $62.00 <br />LABOR CASTS <br />Descr9 tion Hours Hourl Rate Amount <br />Demolition 2 18.5 $33.00 <br />Framin and settin doorframes 17 16.5 $280.50 <br />Han in 19 16.5 $313.50 <br />Finishin walls and ei ht atches 24 16.5 $396.00 <br />Clean u and material handlin 2 16.5 $33.00 <br />Tot al Labor Casts $1,056.00 <br />