Orange County NC Website
ABL Fire Protection <br />Change ordE # 2 <br />Project: Hillsboro Commons 9/1/2009 <br />~~ <br />Material Cost Breakdown <br />uan unit descri tion unit rice extension <br /> <br />2 ea 8" MJ 90 wiacc $ 1 i 4.51 $ 229.02 <br />36 ft 8" CL350 DI i e $ 11.25 $ 405.00 <br />1 ea 8" MJ Sleeve w/ace $ 96.36 $ 96.36 <br />40 ft 3/4" rod $ 2.11 $ 84.40 <br />8 ea 3!4" a eboft $ 2.57 $ 20.56 <br />8 ea 3/4" nut & washer $ 0.56 $ 4.48 <br />2 ea 8" Land set for valve $ 18.22 $ 36.44 <br />2 d Concrete for thrust and deadman $ 125.00 $ 250.00 <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br />0 $ - $ - <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> subtotal $ 1,126.26 <br /> <br /> <br />1 ea Frei ht $ - $ - <br /> <br /> 7°l° safes tax $ 78.84 <br /> <br /> Total $ 1,205.10 <br />