Browse
Search
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 8:46:43 AM
Creation date
5/5/2010 10:21:02 AM
Metadata
Fields
Template:
BOCC
Date
4/21/2009
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Agenda - 04-21-2009 - 4r
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 04-21-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />THIRD AMENDMENT <br />Hillsborough Commons <br />Change order costs <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />38a <br />39 <br />2!15/2010 <br />Status Price Resuonsibility <br />Replace Blown Fuses in Main Panel from power <br />sur e. <br />Work Com lete <br />$ 643 <br />Unforseen Condition <br />Costs for Rock and As halt Removal. Work Com lete $ 2,235 Unforseen Condition <br />Extension of sewer line be and on final sco e. Work Com lete $ 3,900 Unforseen Condition <br />Removal and Replacement of Existing Sewer line <br />with negative flow as shown by OC Camera <br />inspection. Does not account for rock or unsuitables. <br /> <br /> <br />ork Com lete $ 9,547 <br /> <br /> <br />nforseen Condition <br />Se eration of Dollar Tree S rinkler S stems Work Com lete $ 16,500 Unforseen Condition <br />Additional HVAC Permit Fees Work Com lete $ 3,989 Unforseen Condition <br />Add HVAC to rear stora a area. Work Com lete $ 29,364 Unforseen Condition <br />Structural Re airs at Exterior Walls Work Com lete $ 57,777 Unforseen Condition <br />Stora a Area 2 hour wall to out Work Com lete $ 28,581 Unforseen Condition <br />Steel rework at main ent Work Com lete $ 8,734 Unforseen Condition <br />Conduit relocation Work Com lete $ 398 Unforseen Condition <br />Roof re airs Work Com lete $ 16,851 Owner R uest <br />Credit for Car et. Work Com lete $ 44,290 Owner R uest <br />Add Fired Dam ers er Field Memo #5 Work Com lete $ 1,231 Unforseen Condition <br />Wate roofin at Retainin Wall Work Com lete $ 8,580 Unforseen Condition <br />ECS Testin at Exterior Walls Work Com lete $ 2,561 Unforseen Condition <br />Add Door at room 627 excludin demolition Work Com lete $ 1,781 Owner Re uest <br />Roof Re airs and Steel at Rear Stora a Unit Work Com lete $ 2,000 Owner <br />Wirin for HVAC at Rear Stora a Area Work Com lete $ 2,827 Owner <br />Wall furrin on west wall for water roofin Work Com lete $ 5,488 Unforseen Condition <br />Gas Pi in for Generator Work Com lete $ 3,545 Owner <br />Add 20 Amp dedicated circuit for refrigerator in room <br />605 er Field Memo #10. <br />Work Com lete $ 317 <br />Owner R uest <br />Relocate existing outlets already installed per Field <br />Memo #10. <br />Work Com lete $ 189 <br />Owner R uest <br />Existing Panel LF has an existing 225 Amp breaker <br />that need to be replaced with 175 Amp breaker. <br />Panel EDP also needs a 100 Amp 3 Pole Breaker <br />for ATS. Both per Dick Drake on 7/29/09. <br /> <br /> <br /> <br />ork Com lete $ 938 <br /> <br /> <br /> <br />nforseen Condition <br />Electrical changes per field memo #11. Add type H <br />fixture in corridor 447 and demo and reinstall work <br />already in place to allow for 1 hour seperation. <br /> <br /> <br />ork Com lete $ 1,654 <br /> <br /> <br />nforseen Condition <br />Remove and replace concrete in 22 cells per <br />en ineers and In actors Direction. <br />Work Com late $ 6,600 <br />Unforseen Condition <br />Remove existin Ceramic Tile at Main Ent Work Com late $ - Unforseen Condition <br />Relocate backflow and hotbox per engineers <br />direction and relocate existing 8" valve and roadbox. <br /> <br />Work Com late $ 4,061 <br /> <br />Unforseen Condition <br />Credit for using natural gas generator based on <br />Architets a royal of Generac as submitted. <br />Work Com late $ (4,164) <br />Unforseen Condition <br />Electrical Chan es er Field Memo #13. Work Com late $ 2,146 Owner Re uest <br />Electrical Chan es er Field Memo #14 Work Com late $ 317 Owner R uest <br />D all chan es er Field Memo #13 Work Com late $ 1,942 Owner Re uest <br />Door Chan es er Field Memo #13 Work Com late $ 3,982 Owner R uest <br />Plumbin Chan es er Field Memo #14 Work Com late $ 916 Owner R uest <br />Cast iron i in er Field Memo #11 Work Com late $ 1,467 Unforseen Condition <br />Concrete removal and replacement per Field Memo <br />#14 <br />Work Com late $ - <br />Owner <br />Radiation Dam ers er Field Memo #11. Work Com late $ 815 Unforseen Condition <br />Change all single bathrooms from privacy to keyed <br />locks. <br />Work Com late $ 825 <br />Owner <br />Ke ed Panic Bar Work Com late $ - Owner R uest <br />Relocate Dollar Tree fire alarm Wirin Work Com late $ 1,266 Unforseen Condition <br />
The URL can be used to link to this page
Your browser does not support the video tag.