Orange County NC Website
12/02/2009 14:12 9194890435 WAgp~p (~ <br />1MASPCO Corp. <br />Hillsborough Commons DSS Upfit <br />12/2/2009 <br />Dl°_SCRIPTIdN of GRANDE: Upgrade existing 1 Hr. rated wall at Mezaanine. <br />Time and Materials. <br />MATE=R1A1. COSTS <br />Direct Gost of Materials <br />Sales Tax ~ B.7500% <br />Shipping <br />Subtotal Of Material Cost <br />1596 OH&P <br />$3,493.38 <br />$Z .. 038 8 <br />$180.00 <br />$3,909.18 <br />$6.37 $4,495.54 <br />EQUIPMENT COSTS <br />15°~ OH&P <br />LABOR COSTS <br />3896 Labor Burden <br />Subtotal Labor <br />1596 OH&P <br />SUBCONTRACTOR CASTS <br />08% OH&P <br />PROPOSAL. TOTAL AMOUNT <br />~1 33925 <br />X200.89 $1,540.14 <br />$1x,206.50 <br />$5,398.47 <br />$19,6x4.97 <br />$2,940.75 $22,545.72 <br />$o.oa <br />$33.rTo' $o.oo <br />$28,581.39 <br />PAGE 02110 <br />