Browse
Search
RES-2008-084 Comprehensive Plan Update Phase II
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2008
>
RES-2008-084 Comprehensive Plan Update Phase II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 3:58:27 PM
Creation date
4/28/2010 4:46:13 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2008
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
6a
Document Relationships
Agenda - 11-18-2008 - 6a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-18-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 9: Transportation Element <br />.,. <br />2 ^ Long-Range Transportation Plan. The plan is a guide for major transportation <br />3 investments in the Durham-Chapel Hill-Carrboro Metropolitan Planning <br />4 Organization area. It is designed to support land use and air quality goals for <br />5 the urban area, and is prepared in accordance with federal requirements. The <br />6 plan projects the amount and type of transportation demand over a 20-year <br />7 minimum period, and is updated every four years to <br />8 demonstrate compliance with air quality standards. It <br />9 identifies priority highway, bus transit, rail transit, bicycle, and pedestrian <br />10 improvements needed to service future populations, and the projected costs of <br />11 these improvements. The Long Range Transportation Plan is <br />12 fiscally constrained and identifies viable anticipated <br />13 funding sources for proiects proposed in the plan. <br />14 ~- <br />15 __ _ , <br />16 <br />17 - ~,.~~mtR,~~ ~~a~~, <br />18 <br />19 ~ Metropolitan Transportation Improvement Program. <br />20 , <br />21 , <br />22 <br />23 <br />24 <br />2s This program is a seven year document that is included in <br />26 the Statewide Transportation Improvement Program and <br />27 contains funding and schedulin_g information for bicycle: <br />28 pedestrian, highway, rail, public transportation, and <br />29 enhancement protects. Every two years, the Metropolitan <br />3o Planning Organization develops a prioritizeaf list of <br />31 protects to be considered for funding in the biennial <br />32 update of the Metropolitan Transportation Improvement <br />33 Program. Projects must come from adopted <br />34 transportation plans. <br />35 -- <br />36 , <br />37 <br />38 <br />39 , <br />40 ~- <br />41 <br />42 <br />43 <br />44 , <br />4~a.~~Co-uftity CompF-eh.~ive~~T.a~w Public Hearing Draft 5-6-08 Page 9-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.