Orange County NC Website
May 6, 2008 Draft Comprehensive Plan <br />Table of BOCC Accepted Planning Board Revisions <br />(Line items revised by the BOCC have been noted where applicable) <br /> m <br />~- Q <br />c ~ <br /> PB Proposed Revision ° w ~ ~ <br /> (Chapter breaks and new objectives are shaded) ~ ~ <br /> a ~ a <br />~ ~ ~ c ~j ci <br />~ o 'v <br /> <br />*' <br />° °_ ~ U = <br />m <br />' a~ <br /> <br />a a <br />O om <br /> <br />31) <br />6-42 <br />35 Space missing between the words Commission and reviews: "the Historic ELAB <br />9/10/2008 <br /> Preservation Commission reviews ..." Staff <br />32) 6-43 16 Space missing between the words Commission and remains: "The Historic ELAB g/10/2008 <br /> Preservation Commission remains ..." Staff <br /> <br />33) <br />6-43 <br />19 Add emphasis: The Local Landmark Program and the National Register of ELAB <br />9/10/2008 <br /> Historic Places are fwo entire/ distinct and se arate ro rams . Staff <br />34) 6-43 Add to Footnote 41: See Appendix for the Secretary of the Interior's ELAB g/10/2008 <br /> Standards for Rehabilitation.. Staff <br /> Insert line between paragraphs. Last sentence of first paragraph reads, " <br /> <br />35) <br />6-44 <br />14 Today almost 1,600 farms are listed in the program including fifteen from ELAB <br />9/10/2008 <br /> Orange County." Start new paragraph with "Agriculture and preservation Staff <br /> work hand-in-hand ... " <br /> <br />36) <br />6-44 <br />50 Begin sentence with: "Surve s are conducted b archaeolo ical consultants ELAB <br />9/10/2008 <br /> who meet federal standards and t prLically include:..." Staff <br />37) 6-45/46 Include the 3 paragraphs about scenic resources, See.Attachment 6.4.3.1. 9/10/2008 <br /> Staff <br />38) 6-45/47 Adjust map box so that entire legend is visible -MAP 6-6: ORANGE ELAB g/10/2008 <br /> COUNTY SCENIC ROADS MAP. Staff <br />39 6-48 11 The <br />geaf up rpose of the QRT ELAB <br />9/10/2008 <br /> Staff <br />11/18/08 All comments from the May and August Public Hearings were considered by the Planning Board during its review process. 20 of 32 <br />