Browse
Search
Agenda - 08-30-2000 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 08-30-2000
>
Agenda - 08-30-2000 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 12:28:48 PM
Creation date
4/19/2010 12:47:50 PM
Metadata
Fields
Template:
BOCC
Date
8/30/2000
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 08-30-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WR bu,. 7 8 <br />to service a preschool which is assigned three curbside recycling bins and located in a residential <br />area within one of the Towns, County will be billed at the rate of 3 x $3.36 per month or $10.08 per <br />month. <br />The cost of providing curbside recycling service to pedestrian recycling stations that are nearby or <br />adjacent to a curbside recycling route will be determined as follows: the cost will be equal to five <br />(5) times the cost of providing service to a household. For example, during Fiscal Year 2000 -2001 <br />for Contractor to service a pedestrian recycling station located at Carrboro Town Hall, County will <br />be billed at the rate of 5 x $3.36 per month or $16.80 per month. <br />If County and Contractor choose to extend this contract for additional years, actual costs for future <br />years are to be negotiated annually. The formula for negotiating future costs is to be as follows: <br />Cost of collection per household in 2001 -2002 within the Town limits of Carrboro, Hillsborough <br />and Chapel Hill shall not exceed $3.36 per household plus the increased cost factor provided from <br />the Bureau of Labor Statistics Consumer Price Index for Transportation for the South Urban region <br />as measured in March 2001 and compared to March 2000. This cost shall be reduced $0.06 per <br />home for each increment of 5 homes per hour collection efficiency over 50 stops per hour. <br />Cost per household for 2002 -2003 shall be allowed to increase above the 2001 -2002 price by an <br />amount equal to the Bureau of Labor Statistics Consumer Price Index for Transportation for the <br />South Urban region as measured in March 2002 and compared to March 2001. This cost shall be <br />reduced $0.06 per home for each increment of 5 homes per hour collection efficiency over 50 stops <br />per hour. <br />The contract may also be expanded or reduced at the option of County to include additional or <br />fewer residential homes and adjacent small businesses, schools, institutions, churches, and <br />pedestrian recycling stations. If legislation or ordinances are passed which significantly impact the <br />participation in this program, the cost of service for this program may be renegotiated between the <br />Contractor and County. <br />SECTION 4 <br />Performance Sharing <br />Performance Sharing will be based on measured improvements in operational productivity. Any <br />increase in productivity will be measured against a base of 50 homes per hour collected. This <br />measurement shall be based on the actual bin set out rate. If an increase in productivity is <br />measured, for each five homes per hour improvement above the base of 50, Contractor will reduce <br />the cost of the monthly invoice by $0.06 per resident. The homes per hour calculation will be based <br />on the total Set Outs per month divided by the total truck hours required to for the curbside <br />collection vehicles to collect, transport, and unload the recyclable materials. This calculation will <br />be made on a monthly basis from daily reports of total set outs and truck hours. This data will <br />originate from Contractor's daily truck information accumulated each month. Contractor shall <br />furnish the information needed to make such a calculation, and Contractor will make this <br />calculation. Contractor will include both the data used to make said calculation and the result of <br />said calculation with the required monthly report. In the event that an improvement in productivity <br />is determined to have taken place during any month, the cost of collection shall be reduced by - <br />$0.06 per household billed. This reduction in collection cost per household shall be in effect for the <br />month in which the increase in productivity was measured and for all months that follow <br />throughout the remainder of the contract. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.