Orange County NC Website
23 <br />Hollow Rock Access Area Master Plan September 2009 <br />Appendix 2 <br />Hollow Rock Access Area at New Hope Preserve <br />Preliminary Cost Estimate <br />(Development Only) <br />Cost Estimate_ - PhACP_ 1 A /accantinl almmg%ntcl 1 .,.., Lj._K. <br />Entrance Driveway and Parking <br />(Gravel / HC Paved / Wheel Stops) <br />100,000 <br />120,000 <br />Site Amenities <br />(Picnic Tables, Waste /Recycling Receptacles, and Dog Waste <br />Receptacles) <br />8,000 <br />10,000 <br />Restroom Rental annual 1 year / 5 ears <br />2,000 <br />10,000 <br />Additional survey work - Cultural & Archaeological and /or <br />Topographic Estimate <br />20,000 <br />30,000 <br />Entrance Sign and Educational Si na e Art/Structure <br />15,000 <br />20,000 <br />Bridges - 4 stream crossings east side of Pickett Rd ** <br />80,000 <br />125,000 <br />Contingencies <br />25,000 <br />35,000 <br />Total <br />$250,000 <br />$350,000 <br />Mid -Range <br />Cost Estimate - Phase 1 R <br />$300,000 <br />1 nw Winh <br />Land Acquisition TLC parcel)*** <br />96,500 <br />96,500 <br />Platform Overlooks for nature observation ** <br />10,000 <br />30,000 <br />Additional Educational Si na e Art/Structure <br />7,000 <br />10,000 <br />Additional survey work - Cultural & Archaeological and /or <br />To o ra hic Estimate <br />113,500 <br />136,500 <br />Mid -Range <br />Cost Estimate - Phase 2 <br />$125,000 <br />1 nw Hinh <br />Parking <br />(Gravel / HC Paved / Wheel Stops) <br />40,000 <br />50,000 <br />Pickett Road improvements (Top-dress ravel <br />15,000 <br />20,000 <br />Gate <br />5,000 <br />10,000 <br />Additional survey work - Cultural & Archaeological and /or <br />To o ra hic Estimate <br />10,000 <br />20,000 <br />Restroom vault type) and engineering <br />30,000 <br />35,000 <br />Bridges - 2 stream crossings west side of Pickett Rd ** <br />50,000 <br />60,000 <br />Contingencies <br />25,000 <br />30,000 <br />Total <br />$175,000 <br />$225,000 <br />Mid -Range <br />$200,000 <br />* Assumes all trails, kiosks, bike racks are constructed by staff and volunteers <br />** Assumes some amount for consultant and regulatory fees and tests <br />* ** Does not include any work on existing house and outbuildings <br />(Estimates do not include potential costs for rock excavation or dealing with other unsuitable materials <br />that might be found on the site.) <br />20 <br />