Browse
Search
Minutes - 19990209
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1990's
>
1999
>
Minutes - 19990209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 9:52:54 AM
Creation date
4/14/2010 3:32:54 PM
Metadata
Fields
Template:
BOCC
Date
2/9/1999
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 02-09-1999
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 02-09-1999
Agenda - 02-09-1999 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 02-09-1999
Agenda - 02-09-1999 - Questions
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 02-09-1999
Agenda - 02-09-1999 - Sign Up
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 02-09-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--- _ <br /> _- _ __ __ <br /> �-,,� � <br /> �� s'E:, <br /> 3 <br /> 1 is a much safer option. However,this option would store much less'fuel in the pools. If this option <br /> 2 was used, the additional fuel couid be stored in dry-storage in a manner that avoided the fire hazard. <br /> 3 This technology is available and is currently in use, which means that CP,&L could continue to <br /> � ' operate all four of their plants without using Shearon Harris for additional storage. He stated that a <br /> � hearing before a licensing board needs to be held to address these complicated technical questions in <br /> 6 a balanced manner. <br /> 7 <br /> 8 Presentation by Carolina Power& Light @ql'Pcan+afiygS• Mr. Jim Scarola, Vice-President of the <br /> 9 Shearon Harris Plant in charge of nuclear operations, introduced himself and gave background <br /> 10 information on CP&L. He stated that his number one concern is safety. At the Shearon Harris station <br /> 11 they have been moving fuel safely for over ten years. They started shipments from the Robinson <br /> 12 plant to the Brunswick facility in 1977. CP&L provides over fifty percent of the power nee�ls to the <br /> 13 people of North Carolina. He referred to CP&L's safety record and presented an overview of the <br /> 14 design of the building. The facility itself is designed to withstand earthquakes, tornadoes and <br /> 15 hurricanes. They also constantiy measure temperature, flow and water level in the pool. The building <br /> 16 was buiit to support the 40-year operation of the plant plus an additional 20-year license extension of <br /> 17 the plant and then beyond that 30-years of storage. Fuel shipping has always been a part of the plan <br /> 18 in this industry. In the year 2010 shipments will be sent from the Shearon Harris facility to the � <br /> 19 Department of Energy's long-term storage facility in Yucca Mountain, Nevada. He mentioned that <br /> 20 pools C & D receive fuel that has been out of the reactors for three years or more. Those rods have <br /> 21 lost their peak generating capability. He reviewed the safety tests that they put the rods through prior <br />' 22 to shipping. The fuel that they are planning to accept would originate from their plants in Brunswick <br /> 23 and Robinson. He reviewed the licensing amendment request process that they have been involved <br /> 24 with since March of 1998. He mentioned that in 1954 the Atomic Energy Act assigned the Atomic <br /> 25 Energy Commission with the accountability to both promote and regulate the peacetime use of the <br /> 26 atom. In 1974 the Energy Reorganization Act was signed and authorized the abolishment of the <br /> ''� Atomic Energy Commission and developed the Department of Energy and the Nuclear Regulatory <br /> ( Commission. The Nuclear Regulatory Commission was at that time given one charter and that's the <br /> �� charter to protect public health and safety. They have no other accountability. � <br /> 30 <br /> 31 He referred to the current options and pointed out that they are not dry cast vs. pool storage. They <br /> 32 will have pool storage in all of the nuclear facilities in the United States. He asserted that both means <br /> 33 of storage provides equal safety. He went on to explain the safety precautions that have been <br /> 34 established for the proposed fuel storage and shipping. He mentioned that the personnel training is a <br /> 35 significant factor in their safety record. He felt that the plan being presented provides the best of the <br /> 36 alternatives available. <br /> 37 <br /> 38 Qescrir�tion of the Regulatory Process: Dr. Thompson stated that there were two key issues before <br /> 39 the Board. One is to decide whether to apply as an "Intervener" and thereby precipitate the holding of <br /> 40 a hearing and the second is to challenge a determination that has been made by the staff of the NRC <br /> 41 that the license amendment poses "No Significant Hazard". He has been requested by the Board of <br /> 42 County Commissioners to proceed with the necessary technical component of filing to comment on <br /> 43 the °No Significant Hazard" determination. He mentioned that the issue of partial drainage of pools <br /> 44 vs. complete drainage of pools has not been addressed and it is an important issue that should be <br /> 45 addressed. He said that the professional staff of the NRC has made an initial determination of"No <br /> 46 Significant Hazard". The NRC is a Board of Commissioners who vote at public meetings on the <br /> 47 issues that have been presented to them from their staff and from their licensing boards. The <br /> 48 decisions of the NRC Commissioners can be appealed to the Federal courts. The present <br /> 49 determination of"No Significant Hazard" is a proposed determination by the staff. If the determination <br /> 50 of°No Significant Hazard" stands then the proposed action, the placing of racks in the pools can occur <br /> � parallel with the hearing. <br /> L <br /> 53 Diane Curran, by telephone, stated that when the comments are filed on Friday the NRC staff would <br /> 54 consider them. The Commission does not involve itself with the determination of whether a comment <br />
The URL can be used to link to this page
Your browser does not support the video tag.