Browse
Search
Agenda - 04-13-2010 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 04-13-2010 - Work Session
>
Agenda - 04-13-2010 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 11:02:13 AM
Creation date
4/9/2010 4:25:26 PM
Metadata
Fields
Template:
BOCC
Date
4/13/2010
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 04-13-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 3 26 <br /> Proposed New Hope Park at Blackwood Farm <br /> Master Plan Committee <br /> Committee Charge <br /> 1 . DEVELOP A MASTER PLAN FOR THE NEW HOPE PARK AT <br /> BLACKWOOD FARM SITE, WITHIN THE FRAMEWORK OF THE <br /> PRE-CONCEPT PLAN, GUIDING PRINCIPLES (PLEASE SEE <br /> ATTACHMENT 1 ) AND OTHER DIRECTION PROVIDED FROM THE <br /> BOARD OF COMMISSIONERS. <br /> 2. THE MASTER PLAN SHOULD INCLUDE THE FOLLOWING <br /> COMPONENTS: <br /> a. A master plan map for the park. The plan map should include all proposed <br /> buildings, playing fields, other fields, roads, parking, facilities, and <br /> amenities, as well as vegetative cover, hydrology and other components <br /> that are commonly included in park master plans. <br /> b. A written report in support of the master plan map, outlining the proposed <br /> uses, the design rationale, description of work group process, natural and <br /> cultural features, existing and proposed land uses, means of soliciting <br /> community input, potential future phases, and construction cost estimates. <br /> 3. THE MASTER PLAN WILL ADDRESS CO-LOCATION OF <br /> PROPOSED FACILITIES WITH THE GOAL OF PROVIDING FOR <br /> SYNERGIES OF USE AND APPROPRIATE TRANSITIONS BETWEEN <br /> DIFFERENT COMPONENTS OF THE PARK. <br /> 4. THE BOARD OF COMMISSIONERS WILL SUBSEQUENTLY <br /> ADDRESS PHASING, OPERATION AND MAINTENANCE <br /> RESPONSIBILITIES OF THE PARK. <br />
The URL can be used to link to this page
Your browser does not support the video tag.