Browse
Search
Agenda - 04-13-2010 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 04-13-2010 - Work Session
>
Agenda - 04-13-2010 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 11:02:13 AM
Creation date
4/9/2010 4:25:26 PM
Metadata
Fields
Template:
BOCC
Date
4/13/2010
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 04-13-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br /> 11. The overhead power line running through the scenic vista should be <br /> buried during park development. <br /> In terms of more specific facility and use recommendations for the New Hope <br /> Park at Blackwood Farm, the Master Plan Committee proposes the following: <br /> 1. An amphitheatre (at one of three possible locations), <br /> 2. Community Gardens, <br /> 3. An entry road with roundabout and adjoining parking, <br /> 4. A "Learning Center" for nature, agricultural and cultural historical <br /> education, <br /> 5. A Playground near the Learning Center, <br /> 6. An informal multi-purpose field on the western edge of the <br /> property (the "I-40" field), <br /> 7. A series of loop hiking trails (including the historic roadbed trail <br /> and a trail circling the Natural Heritage site), as well as pedestrian <br /> trails connecting different pods of activity within the park, <br /> 8. A potential bike trail through the pine forest wooded area to the <br /> northwest, <br /> 9. A fishing dock on the pond, <br /> 10. A series of picnic shelters in different locations, <br /> -11. An overlook off of New Hope Church Road, with a nearby picnic <br /> shelter, <br /> 12. An open field east of the farmstead for possible use for <br /> agricultural demonstration, <br /> 13. Retention and enhancement of the existing "orchard" north of the <br /> farmstead, <br /> 14. Protection and signage about the old cemetery on the western <br /> portion of the future park. <br /> The following paragraphs provide further elaboration on the facilities listed <br /> above: <br /> • The committee felt it was important to not over-design the site, knowing <br /> that future opportunities and ideas may arise that will need space, and <br /> that there is currently no funding for the park. <br /> • The proposed entry road to the park is sited at the northeastern portion <br /> of the park, in proximity to the planned Parks Operation Base and an <br /> improved line of sight for traffic. <br /> ❑ The proposed amphitheatre (defined here as a "covered performance <br /> shell with surrounding grassy seating") would be an important park <br /> amenity and should be constructed in one of the three locations <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.