Browse
Search
Minutes - 19920601
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1990's
>
1992
>
Minutes - 19920601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2013 12:20:50 PM
Creation date
4/6/2010 10:16:37 AM
Metadata
Fields
Template:
BOCC
Date
6/1/1992
Meeting Type
Regular Meeting
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
say <br /> 3. A setback of 40 feet shall be maintained as measured from the edge of <br /> right-of-way of Davis Road, Hope Valley Drive, and New Hope Springs <br /> Drive. Side yards shall be a minimum of 20 feet, and rear yards a minimum • <br /> of 20 feet. These setback requirements shall be stated on the plat, and in a <br /> document describing development restrictions and requirements to be prepared <br /> by Planning Staff and recorded concurrently with the Final Plat. <br /> G. Certifications <br /> 1. A Certificate of Survey and Accuracy signed by a registered Land Surveyor <br /> shall be notarized on the face of the Final Plat. <br /> 2. A Certificate of Declaration and Maintenance in the form provided in Section <br /> V-D-6-b of the Orange County Subdivision Regulations signed by the <br /> landowner and developer shall be on the face of the plat and included in a <br /> document describing development restrictions to be recorded concurrently with <br /> the Final Plat. <br /> 3. The Department of Environmental Health shall certify that each lot contains a <br /> suitable area for septic disposal. <br /> 4. The North Carolina Department of Transportation shall certify that Hope <br /> Valley Drive, New Hope Springs Drive, and the left turn lane and right turn <br /> taper have been constructed to State standards or that construction plans have • <br /> been approved. <br /> 5. A Certificate of Approval signed by the Orange County Planning and <br /> Inspections Department. <br /> Signatu of Applicant Cle to the Board <br /> accept the above listed conditions of subdivision approval, <br /> an acknowledge each must be met prior to recordation of the final plat. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.