Orange County NC Website
3. The owner/applicant shall designate recreational space as specified in Section IV-B-7- 30 <br />b of the County Subdivision Regulations and in Article 6.12.2.6 in the Zoning <br />Ordinance. The total recreation space required for this development is 0.6 (six tenths) <br />of an acre. The 14.61 acres of open space may serve a dual role of private recreation <br />space provided active recreation improvements are made. <br />4. The HOA shall obtain an approved NCDOT encroachment agreement for the footpath <br />that falls within the public road rights-of-way before construction. <br />5. No activities are allowed in prescribed open space, except recreational facilities. <br />6. Except for construction of footpaths and stormwater improvement facilities [e.g. bio- <br />retention], all areas in reserved open space shall remain in their natural condition. <br />F. Miscellaneous <br />1. The Final Plat shall contain a title block and vicinity map according to standards found <br />in Section V-D-2 and V-D-3 of the County Subdivision Regulations. <br />2. The Final Plat shall reflect the drainage easements as required in D.1 above. <br />3. The open space shall be conveyed by deed to the Homeowner's Association. The <br />County Attorney, prior to their recording, shall approve all instruments of conveyance <br />and restriction. <br />4. Before installation of lighting within the subdivision and to ensure compliance with the <br />Orange County Outdoor Lighting Standards, the owner/applicant shall submit a lighting <br />plan to the Planning Department for review and approval. <br />5. The Planning and Solid Waste Departments shall review and approve a plan for the <br />collection and proper disposal of all tree stumps and fallen logs before approval of the <br />erosion control plan. <br />6. The ownerlapplicant shall note impervious cover square footage limits for each lot on <br />the Final Plat. <br />7. Clean wood waste, scrap metal, and corrugated cardboard, shall be recycled. <br />8. All haulers of construction waste shall have proper licensing through the Orange <br />County Solid Waste Department. <br />9. Before any on-site construction activity, the ownerlapplicant shall hold a pre- <br />construction conference with the County Solid Waste staff. This may be the same <br />meeting held with other development officials. <br />10. Before installation of a subdivision sign, County Planning shall review and approve a <br />site plan and construction drawings. <br />11.The owner/applicant shall install a water withdrawal system for emergency fire <br />suppression with signage acceptable to the Orange County Fire Marshal prior to <br />recordation of the final plat. <br />