Browse
Search
Agenda - 04-06-2010 - 4o
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 04-06-2010 - Regular Mtg.
>
Agenda - 04-06-2010 - 4o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2015 4:39:55 PM
Creation date
4/1/2010 2:50:47 PM
Metadata
Fields
Template:
BOCC
Date
4/6/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4o
Document Relationships
2010-040 AMS - Owens Roofing for roof repair at John M. Link, Jr. Government Services Center
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 04-06-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: April 6, 2010 <br /> Action Agenda <br /> Item No. <br /> SUBJECT: Bid Award -- Roof Repair at John M. Link, Jr. Government Services Center <br /> DEPARTMENT: AMPS PUBLIC HEARING: (YIN) No <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> Pam Jones, (9'19) 245-2652 <br /> Bid Tabulation David Cannell, (9'19) 245-2651 <br /> Engineers' Recommendation <br /> Agreement <br /> PURPOSE: To consider awarding a bid to Owens Roofing, Inc. of Raleigh, North Carolina to make <br /> repairs to the roof at the John M. Link, Jr. Government Services Center. <br /> BACKGROUND: The John M. Link, Jr. Government Services Center was built in 1992. The roof is <br /> comprised of sloping metal sections as well as flat sections that are covered by a rubber membrane. <br /> Although minor repairs have been made in the past, no major repairs have been completed on the roof at <br /> the facility. over the years leaks have developed in the sections covered by the rubber membrane and <br /> where the metal roof sections meet the rubber membrane. <br /> Staff has worked with Fifth Wall Building Diagnostics to determine the best Solution for repairing the roof. <br /> It was the determined that the best solution would be to: 1} apply a second membrane over the existing <br /> membrane; 2}repair existing sheet metal flashings; and 3}reseal all joints where the metal sections <br /> meet the rubber membrane. <br /> Bids were solicited with three firms responding. Owens Roofing, Inc. of Raleigh, North Carolina <br /> submitted the lowest responsible bid at a turnkey cost of $27,777 (see attached tabulation as well as <br /> letter from Fifth Wall recommending the low bidder). The product bid by Owens is covered by a ten year <br /> manufacturer's warranty. <br /> Work will be scheduled to limit interruptions to the staff at the Link Center. <br /> FINANCIAL IMPACT: Total cost of this action, if approved by the Board, would be $27,777. Sufficient <br /> funds are available within the Capital Investments Roofing Projects account (project 30002) to cover this <br /> expenditure. <br /> RECOMMENDATION(S): The Manager recommends the Board award the bid from Owens Roofing, <br /> Inc. of Raleigh, North Carolina at a total cost of$27,777 and authorize the Chair to sign the agreement <br /> on behalf of the Board.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.