Browse
Search
2010-032b Planning - Contract Professional Services Related to Orange County Unified Development Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-032b Planning - Contract Professional Services Related to Orange County Unified Development Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 8:29:29 AM
Creation date
3/29/2010 11:23:00 AM
Metadata
Fields
Template:
Contract
Date
3/2/2010
Contract Starting Date
3/2/2010
Contract Ending Date
12/17/2010
Contract Document Type
Agreement - Services
Agenda Item
4l
Amount
$30,000.00
Document Relationships
Agenda - 03-02-2010 - 4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 03-02-2010 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith, Jonathan T.—Resume <br /> W.F.Hunt, A.R. Jarrett,and J.T. Smith.2003.Field Study of Bioretention Areas in North Carolina. <br /> Proceedings of 2003 ASAE Annual International Meeting,Las Vegas,NV. <br /> J.T. Smith and W. F.Hunt. 2002.Designing Bioretention Areas to Increase Denitrification. Presented at <br /> StormCon 2002. Marco Island,FL. <br /> J.T. Smith and R. O.Evans.2000.Field Evaluation oflrrigation Systems Applying Lagoon Effluent. <br /> Proceedings of Watershed Management 2000 Symposium. Science and Engineering for the New <br /> Millennium. <br /> R. O.Evans,R.E. Sneed,R. E.Sheffield,J.T. Smith. 1999. Wettable Acreage Determination for Hard <br /> Hose Traveler. N.C.Cooperative Extension Service.AG-553-7. N. C. Cooperative Extension Service. <br /> R. O.Evans, R.E. Sneed,R.E. Sheffield,J.T. Smith. 1999. Wettable Acreage Determination for <br /> Stationary Sprinkler/Irrigation System. N.C. Cooperative Extension Service.AG-553-6. N.C. <br /> Cooperative Extension Service. <br /> J.T. Smith and R.O.Evans. 1998.Evaluation of BMPs to Improve Drainage Water Quality from <br /> Agricultural Lands Irrigated with Swine Lagoon Effluent.In: Drainage in the 21 n Century: Food <br /> Production and the Environment.Proceedings of the 7`"International Drainage Symposium. <br /> R. O.Evans,J.C.Barker,J. T. Smith,R.E. Sheffield. 1997.Field Calibration Procedures for Center <br /> Pivot and Linear Move/Irrigation System.N.C. Cooperative Extension Service.AG-553-3. N. C. <br /> Cooperative Extension Service. <br /> R. O. Evans,J.C. Barker,J. T. Smith,R.E. Sheffield. 1997. Field Calibration Procedures for Hard Hose <br /> and Cable Two Traveler/Irrigation System. N.C.Cooperative Extension Service.AG-553-2. N.C. <br /> Cooperative Extension Service. <br /> R. O.Evans,J.C. Barker,J. T. Smith,R.E. Sheffield. 1997. Field Calibration Procedures for Stationary <br /> Sprinkler/Irrigation System. N.C.Cooperative Extension Service.AG-553-1. N.C. Cooperative <br /> Extension Service. <br /> I <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.