Orange County NC Website
Smith, Jonathan T. —Resume <br /> Selected Project Experience <br /> Pulaski County Stormwater Design Manual and Site Evaluation Tool Development,Pulaski Co., <br /> AR. Managing project for Pulaski County Arkansas to develop stormwater drainage design manual and <br /> Site Evaluation Tool(SET). Coordinating the planning for and facilitation of a workgroup meeting <br /> comprised of local public agency and stakeholder engineering staff to identify and develop manual <br /> components and SET user interface functions. Providing oversight for technical staff in development of <br /> design manual incorporating functionality specific to Pulaski County development conditions. <br /> Supervised development of the SET incorporating lower limit effluent limitations on BMP performance <br /> for local conditions including low density development and steep slope topography. <br /> Third Fork Creek Watershed Planning and Design,Durham,NC—Task manager for a$1M+ <br /> planning and design project in Durham,NC. Relevant tasks included stormwater retrofit planning and <br /> design, LID and Better Site Design,and BMP maintenance program review for Third Fork Creek. <br /> NCEEP Alternative Wetland Mitigation Stormwater BMP Pilot Project.For the North Carolina <br /> Ecosystem Enhance Program,supervised application of a proposed method for determining mitigation <br /> credits associated with two constructed stormwater wetland BMPs in the Catawba River basin.The <br /> project represents a potential pilot for urban watersheds where available land for traditional wetland <br /> mitigation does not meet overall mitigation needs. <br /> San Diego LID Manual,San Diego CA. Supporting preparation of a Low Impact Development manual <br /> for the City of San Diego's stormwater program. To date,has provided review of performance criteria <br /> for stormwater best management practices required by San Diego County.Review included research of <br /> criteria for volume and flow based control practices and associated publications detailing development of <br /> these performance criteria. Results were utilized to recommend criteria which were most appropriate to <br /> the city's objectives and incorporation into the manual. <br /> McDowell Creek Watershed Restoration,Mecklenburg Co,NC. Project Manager for restoration of <br /> 1,631 feet of second order stream and creation of four stormwater BMPs in an urbanized watershed. <br /> Provided project scoping,technical oversight of design,permitting and preparation of construction <br /> documents. Stormwater BMPs included offline wetland/infiltration systems incorporating shallow <br /> diversion of upstream runoff from the restored stream reach as well as a combination bioretention <br /> area/level spreader system treating a municipal animal shelter"hot spot". <br /> McAlpine Creek Stream Restoration and Stormwater Improvements,Mecklenburg Co,NC. <br /> Design engineer responsible for preparation of design documents related to the retrofit of an existing <br /> urban pond to a stormwater treatment facility consistent with the Center for Watershed Protection's"New <br /> Emergent Wetland"design guidance. The existing pond exhibited poor conditions including undersized <br /> outlet, failing banks,excessive waterfowl use and lack of vegetation. The modified design incorporated a <br /> forebay to pre-treat flows entering the facility, an extended detention settling zone,a bypass structure for <br /> larger flows, and a low flow wetland to provide polishing treatment of baseflow and smaller runoff <br /> events. <br /> Central Yard Municipal Facility Stormwater Retrofit Design,Charlotte,NC. Project Manager for <br /> the identification of methods to reduce impacts of a municipal vehicle maintenance and washing facility <br /> on adjacent surface waters through source reduction and modifications to an existing non-functioning <br /> filter system. Conducted a feasibility analysis of various source reduction techniques and BMP <br /> modifications incorporating site operational restrictions,municipal NPDES phase II compliance <br /> requirements,and existing infrastructure conditions. Provided design and preparation of construction <br /> documents for specific improvements including diversion of rooftop runoff directly to stream, <br /> construction of rooftop over vehicle washpad,and conversion of filter system to a staged detention, <br /> vertical filter,finishing wetland system <br /> Partners Equity Stormwater Improvement,Partners Equity Group,Smithfield,NC. Managed the <br /> development of design and permitting for the conversion of an existing wetpond serving a 51 acre <br /> 2 <br />