Orange County NC Website
5 <br /> • Proposed design approach for the project(s) and schedule for completion, <br /> • Understanding of the area where the project is located, <br /> • Rate structure for proposed staff including all sub-contractors, and <br /> • Other factors that may be relevant to the project. <br /> VI. Project Timeline: <br /> The timeline for this project is as follows: <br /> -------------------------------------------------------------------------------------- <br /> ------------------Process-------------------20DY------------------201V-------------- <br /> Task a s o n d j f m a m j a s o n d <br /> Task 1 <br /> 1- BOCC Adoption of Process X <br /> 2. Draft UDO Outline Xti> <br /> 3• Outreach- Countywide Mtgs. (2) X <br /> 4. Joint Board Mtg. X <br /> 5. Consultant RFP Process X X X <br /> 6. BOCC Update - Approve UDO X <br /> Outline <br /> Task 2 <br /> 7. Draft Sections of UDO -New X X <br /> Regulations <br /> 8. Courtesy Review _ x X X <br /> 9. Staff/Consultant Coordination- - X X X nE <br /> Graphics <br /> 10. Outreach- Countywide Mtgs. (2) X <br /> 11. Planning Board(PB)Review x X X <br /> 12. BOCC - Staff Report X <br /> Task 3 <br /> 13. Complete First Draft UDO X X $; <br /> 14. Outreach- Countywide Mtgs. (2) X <br /> 15. Courtesy Review X X X <br /> 16. Planning Board Review X X X <br /> 17. Consultant Final Deliverables X } <br /> 18- Complete Public Hearing Draft UDO X } <br /> 19. BOCC - Staff Report X <br /> 20. Joint BOCC/PB Public Hearing <br /> 10/23/2009 <br />