Orange County NC Website
11 <br /> structure to the public. Staff shall be responsible for <br /> documenting and detailing public comments, suggestions, <br /> and concerns. <br /> These comments, suggestions, and concerns shall be <br /> addressed in preparation of the Implementation Bridge. <br /> C. Task Three—Public Hearing Draft UDO and Annotated Outline for the <br /> August 23, 2010 Quarterly Public Hearing: Clarion personnel will be <br /> responsible for taking the first draft UDO, prepared by the County, and <br /> reformatting it to serve as a draft for Public Hearing. Clarion will not be <br /> reviewing the document for content or substance, but focusing on formatting <br /> and presentation of the regulations. This task will include inserting graphics <br /> and reformatting for publication quality fit and finish. During this Task, the <br /> Consultant will also be working to complete the Implementation Bridge <br /> described below. $5,000 of the project budget will be set aside for production <br /> of graphics to include in the new UDO. <br /> The Implementation Bridge that will be prepared as part of this Task will <br /> include a summary of issues, comments, suggestions, and concerns, along <br /> with strategies for addressing these. The Implementation Bridge will discuss <br /> the structure and use of the new UDO, and identify issues and opportunities <br /> for inclusion in subsequent amendments to the new LIDO. (The length of the <br /> Implementation Bridge is expected to be 15-17 pages.)AIl comments received <br /> as part of the review of the initial drafts of the UDO shall be compiled within <br /> the Implementation Bridge as well. <br /> At the August 2010 Quarterly Public Hearing the Consultant, along with staff, <br /> will present the public hearing draft of the UDO and the Implementation <br /> Bridge to the BOCC and Planning Board for review and comment. <br /> Meeting Targets: May through July 2010 — Consultant shall meet with <br /> staff, as needed, to review reformatting options for the <br /> UDO project and the Implementation Bridge (two on-site <br /> meetings, and telephone discussions as needed). <br /> August 23, 2010—Quarterly Public Hearing. Consultant <br /> to attend. <br /> September through November 2010 — The Consultant <br /> will work with staff to address necessary revisions to the <br /> Implementation Bridge in person or via conference call <br /> (estimate one on-site meeting). Consultant will to <br /> commit up to $1,500 of project budget for time related to <br /> revisions to the UDO. Consultant shall be available to <br /> complete additional revisions on a time and materials <br /> basis. <br />