Orange County NC Website
5 <br /> • Proposed design approach for the projects) and schedule for completion, <br /> • <br /> U nderstandi*ng of the area where the project is located, <br /> • Rate structure for proposed staff including all sub-contractors, and <br /> • Other factors that maybe relevant to the project. <br /> VI. Project Timeline: <br /> The timeline for this project is as follows: <br /> -------------------------------------------------------------------------------------- <br /> ------------aft-----Process------------------20D�------------------2D17j-------------- <br /> Task a s o n d j f m a m j a s o n d <br /> 5% <br /> C. <br /> Task 1 <br /> 1• BOCC Ad option of Process X <br /> 2• Draft UDO Outline X <br /> 3• Outreach- Countywide mLjtgs. (2) X <br /> 4.8 Joint Board Mtg. X <br /> 5. Consultant RFP Process X X X <br /> 60 BOCC Update - Approve UDO X <br /> Outline <br /> Task 2 <br /> 7. Draft Sections of UDO New X X <br /> Regulations <br /> g• Courtes i R evew - xx <br /> Y <br /> 9• Staff/Consultant Coordination <br /> Graphics - X X X <br /> 10. Outreach- Countywide Mtgs. (2) X <br /> 11. planning Board(PB)Review X X <br /> 12• BOCC - Staff Report X _ <br /> Task 3 <br /> 13. Complete First Draft UDO X X $; <br /> 14. Outreach- Countywide Mtgs. (2) X �i Wp. <br /> 15. Courtesy Review X X X � <br /> 1640 planning Board Review X X X <br /> 17• Consultant Final Deliverables X } <br /> +r:p <br /> 188 Complete Public Hearing Draft UDO X }° <br /> 19. BOCC - Staff Report X <br /> 20• Joint BOCC/PB Public Hearing <br /> 10/23/2009 <br />