Browse
Search
2010-032 Planning - Professional Services Related to the Orange County Unified Development Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-032 Planning - Professional Services Related to the Orange County Unified Development Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2018 9:16:42 AM
Creation date
3/29/2010 11:22:00 AM
Metadata
Fields
Template:
Contract
Date
3/2/2010
Contract Starting Date
3/2/2010
Contract Ending Date
12/17/2010
Contract Document Type
Agreement - Services
Agenda Item
4l
Amount
$30,000.00
Tags
6-year Retention
Document Relationships
Agenda - 03-02-2010 - 4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 03-02-2010 - Regular Mtg.
R 2010-032 Planning - Clarion Associates
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 30-3:Zoning Districts <br /> Section En Business Base Zoning Districts <br /> Subsection 7:Light Industrial(U)District <br /> I MEN~ <br /> 7. LIGHT INDUSTRIAL(LI) DISTRICT <br /> The Ught Industrial(U)District is established and intended to accommodate light manufacturing, <br /> assembly,fabrication,processing,distribution,storage,research and development and other <br /> industrial uses that are small-scale or otherwise have minimal exterior movement of vehicles, <br /> materials,and goods,as well as few or minimal adverse environmental and visual impacts. The <br /> IL <br /> districtis subject to standards intended to minimize potential nuisances or damage to the <br /> � ernironment and adverse impacts on surrounding uses. <br /> AL <br /> a 1P <br /> -W <br /> Lot area,min.(sq ft) 20,000 n/a <br /> Lot width,min.(ft) 75 n/a <br /> Lot coverage,max(*A of lot area) 65 <br /> Height,max.(ft) 90;50 when abutting asingle-family residential district 30; 15 when abutting a <br /> single-family zoning district <br /> Front and corner setback min. 50;75 from street centerline <br /> fft\ Not allowed in front,side,or <br /> corner side yard areas <br /> Side setback min.(ft) 30 <br /> Rear setback,min.(ft) 20;none where abutting a railroad right-of-way 5;50 where abutting a <br /> residential zoning district <br /> Spacing between buildings, ZD 5 <br /> min.(ft) <br /> Open Space Set-Aside Clo of Residential uses: :Nonresidential and mixed-uses:[to be determined in Module 3] <br /> parcel size) <br /> NOTES:[I]Accessory structures/use areas shall not exceed the lesser of.5,000 square feet in size or 30%of the allowable lot <br /> coverage. <br /> 59 The U di ct carries forward the M I district standards, but there are new provisions for lot area, lot width, lot coverage,and height We <br /> recommend that minimum lot area and lot width standards be added,and that dmy be small enough to accommodate small-scale light industrial uses <br /> (e.g.,flex space buildings). <br /> June 2009 City of Fayetteville,No Carolina <br /> Page 3-31 Unified Development Ordinance-Module Two Public Review Draft(REVISED) <br />
The URL can be used to link to this page
Your browser does not support the video tag.