Orange County NC Website
the Westinghouse Model AP4100 reactor technology proposed for use is <br />not expected to be designed, reviewed and permitted by the NRC before <br />2011; and <br />WHEREAS, in the light of persistent drought conditions and demands for water, there <br />are serious concerns about the adequacy of cooling water available far <br />additional reactors at Shearon Harris. <br />NOW, THEREFORE, do we, that the Orange County Board of Commissioners, hereby <br />resolve to: <br />• Oppose in the strongest terms possible the issuance of a permit. by the NRC or <br />of a Certificate of Convenience and Necessity by the NC Utilities for the Progress <br />Energy plan to permit, design and construct one or more nuclear power reactors <br />at the Shearon Harris nuclear power plant. <br />This is the 31 day of July, 2008. <br />Barry Jacobs, C air <br />. Orange County Board of Commissioners <br />