Browse
Search
RES-2008-048 Progress Energy Proposal–2 new Nuclear Reactors Shearon Harris Nuclear Power Plant
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2008
>
RES-2008-048 Progress Energy Proposal–2 new Nuclear Reactors Shearon Harris Nuclear Power Plant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 12:01:31 PM
Creation date
3/18/2010 11:11:58 AM
Metadata
Fields
Template:
BOCC
Date
6/24/2008
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
62e
Document Relationships
Agenda - 06-24-2008-6e2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 06-24-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Westinghouse Model AP4100 reactor technology proposed for use is <br />not expected to be designed, reviewed and permitted by the NRC before <br />2011; and <br />WHEREAS, in the light of persistent drought conditions and demands for water, there <br />are serious concerns about the adequacy of cooling water available far <br />additional reactors at Shearon Harris. <br />NOW, THEREFORE, do we, that the Orange County Board of Commissioners, hereby <br />resolve to: <br />• Oppose in the strongest terms possible the issuance of a permit. by the NRC or <br />of a Certificate of Convenience and Necessity by the NC Utilities for the Progress <br />Energy plan to permit, design and construct one or more nuclear power reactors <br />at the Shearon Harris nuclear power plant. <br />This is the 31 day of July, 2008. <br />Barry Jacobs, C air <br />. Orange County Board of Commissioners <br />
The URL can be used to link to this page
Your browser does not support the video tag.