Browse
Search
2010-120 AMS - Coulter Jewell Thames, PA - Amendment to Contract for greenway trail at the Twin Creeks Park
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-120 AMS - Coulter Jewell Thames, PA - Amendment to Contract for greenway trail at the Twin Creeks Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 3:40:32 PM
Creation date
3/15/2010 11:12:32 AM
Metadata
Fields
Template:
Contract
Date
2/16/2010
Contract Starting Date
1/7/2010
Contract Document Type
Contract Amendment
Agenda Item
4f
Amount
$81,400.00
Document Relationships
Agenda - 02-16-2010 - 4f
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 02-16-2010 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 WEST MAIN STREET <br />DURHAM. NORTH CAROLINA 27701 <br />p919 682.0368 f919.688.5646 <br />F a.,.,.~g ..,, ~ ,.,.~~e <br />LETTER OF AMENDMENT TO AN EXISTING CONTRACT <br />made this 7th day of January, 2010 <br />To The OWNER <br />Orange County -Asset Management and Purchasing Services <br />PO Box 8181 <br />Hillsborough, NC 27278 <br />Attn: Jeff Thompson <br />By The SITE CONSULTANT <br />Coulter Jewell Thames, P.A. <br />l I 1 West Main Street <br />Durham, North Carolina 27701 <br />For Landscape Architecture and Civil Engineering Services <br />For additional services related to the construction administration and inspection of the greenway trail at the / <br />Twin Creeks District Park located in Carrboro, North Carolina. ~~ <br />Description <br />This proposal is for additional Civil Engineering services related to the construction administration and <br />inspection of the greenway trail at the Twin Creeks District Park. During the design phase of the project, <br />Orange County was able to obtain ARRA funding for a portion of the trail construction. A requirement of <br />receiving ARRA funding for the project is that full time inspection services be provided, and that <br />construction phase services be provided as if the project were a NCDOT project. The ARRA funding also <br />requires additional state and federal reporting requirements be met during construction. The construction <br />phase services required by ARRA exceed the scope of construction phase services in the design contract for <br />the greenway trail. <br />This proposal does not include NCDOT certified testing of construction materials. Orange County will be <br />responsible for contracting with a certified testing firm to provide construction material testing as required <br />by NCDOT requirements. The construction material testing required includes, but is not limited to, soil <br />density tests, stone density test, concrete sampling and tests. <br />ADDITIONAL SCOPE OF BASIC SERVICES: <br />1 Construction Phase Services <br />l .Ol Provide a resident project representative who will be at the site at times construction crews are <br />working who will be responsible for preparing and maintaining all written documentation <br />necessary to satisfy NCDOT to comply with A. R. R.A. funding procedures for the Twin Creeks <br />Greenway Project. <br />1.02 Prepare daily reports, journals and logs of all construction activities and construction work <br />performed in accordance with NCDOT guidelines. <br />1.03 Document the receipt of all materials, equipment and machinery delivered to the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.