Orange County NC Website
to <br />0 <br /> U er Eno "Protected" U er Eno "Critical Area" <br /> buffer width shall be calculated using whichever is greatest. <br /> Method A, but shall not be less than 100'. <br />Water No new treatment system will be New septic tanks, pump tanks and their <br />Supply/Sewage permitted where effluent disposal occurs appurtenances shall be located outside of any <br />Disposal. on a separate lot from the source of stream buffers and at least 100 feet from a <br /> wastewater generation; provided, perennial or intermittent stream as shown on <br /> however, off-site systems shall be the USGS Quadrangle maps, and at least 150 <br /> permitted when located in a Flexible feet from a reservoir. <br /> Development subdivision approved in -New nitrification fields shall be located outside <br /> accordance with Section IV-B-10 of the of any stream buffers and at least 100 feet <br /> Orange County Subdivision Regulations. from a perennial or intermittent stream as <br /> • New septic tanks and their nitrification shown on the USGS Quadrangle maps, and <br /> fields shall be located outside of any at least 300 feet from a reservoir. <br /> stream buffers and at least 100 feet from Water supply and sewage treatment systems <br /> a perennial or intermittent stream as shall be limited to individual wells and septic <br /> shown on the USGS Quadrangle maps. systems or individual on-site alternative <br /> disposal systems; provided, however, off-site <br /> systems shall be permitted when located in a <br /> Flexible Development subdivision approved in <br /> accordance with Section IV-B-10 of the <br /> Oran a Count Subdivision Re ulations. <br />