Browse
Search
ORD-2010-025 Upper Eno Watershed Critical Area-Zoning Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2010
>
ORD-2010-025 Upper Eno Watershed Critical Area-Zoning Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 3:04:34 PM
Creation date
3/5/2010 12:50:21 PM
Metadata
Fields
Template:
BOCC
Date
2/22/2010
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
1
Document Relationships
Minutes 02-22-2010
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
Minutes 02-22-2010
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~P <br />00 <br />Impervious Surface/ <br />Detention Pond <br />Requirements <br />(Residential) <br />Eno "Protected" <br />• 12% impervious surface limit for existing <br />and new lots outside of Transition Areas <br />as designated on the Orange County <br />Land Use Plan. <br />• BMPs [Best Management Practices] <br />cannot be used to satisfy watershed <br />impervious surface requirements. <br />• 30% impervious surface limit for <br />developments which exceed a density of <br />1 du/acre within Transition Areas. <br />Structural BMPs are required if <br />impervious surface exceeds 12%. <br />Eno "Critical Area" <br />6% impervious surface limit except for lots <br />smaller than 2 acres which existed prior to <br />1/1/94, which are subject to a sliding scale <br />contained in Section 6.23.3 of the Zoning <br />Ordinance. <br />BMPs [Best Management Practices] cannot <br />be used to satisfy watershed impervious <br />surface requirements. <br />Impervious Surface/ <br />Detention Pond <br />Requirements (Non- <br />Residential) <br />• 70% impervious surface limit in <br />Commercial and/or Industrial Nodes as <br />designated in the Land Use Element of <br />the Comprehensive Plan (high-density <br />option) with structural BMPs if impervious <br />surface is greater than 12%; <br />AND <br />50% impervious surface for all fire <br />stations and solid waste collection <br />centers outside of Commercial and/or <br />Industrial Nodes as designated in the <br />Land Use Element of the Comprehensive <br />Plan, with structural BMPs if impervious <br />surface is greater than 12%; <br />AND <br />• 12% impervious surface for all other non- <br />• 2-acre minimum lot size and 6% impervious <br />limit. <br />• BMPs [Best Management Practices] cannot <br />be-used to satisfy watershed impervious <br />surface requirements. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.