Orange County NC Website
76 <br />Smith, Tonathan T. -Resume er flow <br />services to correct difficuitiei mof sampling intakesrand difficult) acces b o sampling locations. <br />measurement devices, clogg g Ci of Jacksonville, Jacksonville, NC. <br />Jacksonville Water Supply and Treatment Facilities, ty. <br />en ineer for design and permitting of a Stormwater wetland for an 8 mgd nanofiltrafion treatmen <br />Design g aced com lete construction plans and application documents for <br />facility for the City of 7afokr anvcova tof Coastal Area Stormwater Permit. <br />submission to NCDW Q pp ro ect for City of Charlotte to <br />Ci of Charlotte, Charlotte, NC. ManC 9 aP~ pond to improve pollutant <br />Shade Valley Outlet, tY <br />design structural modifications to the outlet of an existing <br />removal performance. Specific modifications included the implementation of an adjustable outlet to <br />allow modification of permanent pool level and design drawdown period. Modifications were <br />]anted areas and improve vegetative growth <br />implemented to ailo~v management of water level depthof Charlotte, Charlotte, NC. Managed Project <br />Edwards BranchEeasibility Study and Design, City <br />for City of Charlotte to conduct feasibility study and provide design services for retrofit modifications to <br />the Edwards Branch Stormwater W etland. The offline wetland provided water quality treatment an <br />rimaril of single family residential and cornmereiat uses. <br />detention fora 50+ acre watershed comprised p Y oor soil conditions, improper water <br />the soil characteristics and <br />Wetland vegetative coverage within the wetland was limited Y P the wetland <br />levels and waterfowl activirovided a report on the fees bit ty andlcos of i prroving <br />overall management and p <br />performance through soil amendmenUaddition, outlet stmcture modifications, and waterfowl eterren s. <br />rove the general performance of the BMP in relation to water quality <br />The purpose of the design was to imp <br />treatment. Design services included preparation of const~su able marsh soil where necescsarrY, of e <br />outlet structure, excavation ~ n, and prescriptive Ovate fowl deterrent measures. conducted <br />development of a planting p <br />St. James Hydraulic Study, Brunswick Co, NC. Eor the St. lames Develop o ident ~ improvements to <br />of an existing xesidentiaUgolf course communi included consideration of <br />a watershed hydraulic study <br />relieve flooding concerns observed in recent tropical storm systems. Stu y <br />improvements to golf course ponds such as active management of pond control structures eventually <br />manifesting in the development of an emergency action plan. ram, Ctarlotte, NC. <br />Development of a Municipal Pilot Stormwater Retrofit BMP MomU Gang manual. Identified BMP's <br />e of coordinating city and county stormwater professionals to develop a pilot <br />Extension Engineer in charg ro rammatic monitoring <br />BMP monitoring program. Developed Stormwater BrMP'ate site see cfic and p g <br />idance on app p riate statistical analysis and <br />for monitoring efforts and provided gu <br />equipment and techniques. Advised municipal stormwam results in local e egionat and national <br />interpretation of program results for inclusion of progr <br />monitoring performance databases. <br />Dye Branch Stormwater Wetland, Mooresville, NC. Provided design services for the site se ectron, <br />re aration, permitting and constmction administration for an offline <br />design, construction documents p p orated multi-cell, tiered <br />tiered Stormwater wetland an urbanized watershed. Wetland design rncorp uali <br />of the effectiveness of BMP size and <br />configuration allowing the inclusion of the site in a study <br />performance limitations of multi~oencrtolxmg of Greetn Roof Installations1in Eastern North Carolina. <br />Runoff Quantity and Quality stems for three greenroof <br />Extension Engineer in charge of design and installation of monitoring sy <br />installations in eastern North Carolina. Purpose of-the project tivas to determine the impacts-of-greenroofs . <br />on the quantity and quality of rooftop runoff in Eastern North Carolina. <br />Joyner Park Bioretention, Louisburg, NC. Extension Engineer in charge of design, construction <br />management and monitoring of two bioretention areas p dmlomg on atm utant removafreffectiven s of <br />pazk. Research investigated effects of soil media and by gY p <br />bioretention areas in piedmont settings. <br />4 <br />