Browse
Search
Agenda - 03-02-2010 - 4l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 03-02-2010 - Regular Mtg.
>
Agenda - 03-02-2010 - 4l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2010 9:23:42 AM
Creation date
2/26/2010 9:18:26 AM
Metadata
Fields
Template:
BOCC
Date
3/2/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4L
Document Relationships
2010-032 Planning - Professional Services Related to the Orange County Unified Development Ordinance
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
2010-032b Planning - Contract Professional Services Related to Orange County Unified Development Ordinance
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 03-02-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
74 <br />Smith, Tonafhan T. -Resume <br />Selected_Project_Experience ____-_~.___~.------------------------ <br />Pulaski County Stormwater Design Manual and Site Evaluation Tool Development, Pulaski Co., <br />Slue Evaluation Tool (SET). uCoordinating the plannmg for and facilitation of a workgroup meet ng and <br />comprised of local public agency and stakeholder engineering staff to identify and develop manual <br />components and SET user interface functions. Providing oversight fodeve o mentaconditonslopment of <br />design manual incorporating functionality specific to Pulaski County P <br />Supervised development of the SET incorporating lower limit effluent limitations on BMP pexfonnance <br />for local conditions including low density development and steep slope topography. <br />Third Fork Creelc Watershed Planning and Design, Durham, NC -Task manager fora $IM+ <br />design, LID and BetteroSite Design, and BMP maintenance program revle v for Third Fork Creek. and <br />NCEEP Alternative Wetland Mitigation Stormwater BMP Pilot Project. For the North Caro ma <br />mill ation <br />Ecosystem Enhance Program, supervised application of a proposed method for detennining g <br />pro et represent a potential p'to for urban w tersheds wheBre availableel nd fortrad tional wet and <br />mitigation does not meet overall mitigation needs. re aration of a Low Impact Development manual <br />San Diego LID Manual, San Diego CA. Supporting p p <br />for the City of San Diego's Stormwater program. To date, has provided review of performance criteria <br />for stonmvater best management practices required by San Diego County. Review included reseazeh of <br />threserperfomrance riteria`vResuls werre utl ed to recommend cxit rbarwhich tivere rmost appropriate to f <br />the city's objectives and incorporation into the manual. <br />1163Diofeellof second ordexstre me and creatiohn oftf enbuor~W ater BMPs in an urabamzed wale shed.n of <br />Provided project scoping, technical oversight of design, permitting and preparation of construction <br />documents. Stormwater BMPs included offline wetland(infiltrationSystems incorporating shallow <br />diversion of upstream runoff from the restored stream reach as well as a combination bioretention <br />area/tevei spreader system treating a municipal animal shelter "hot spot". <br />McAlpine Creek Stream Restoration and Stormwater Improvements, Mecklenburg Co, NC. <br />Design engineer responsible for preparation of design documents related to the retrofit of an existing <br />urban pond to a Stormwater treatment facility consistond exhibited poor conditions ncluding tundersized <br />Emergent W etland" design guidance. The existing p orated a <br />outlet, failing banks, excessive waterfowl use and lack of vegetation. The modified design incorp <br />larger Boi Pr and a low flow we and to provide polish'mgardeattment of baseflow and smaller runoffre for <br />events. <br />Central Yard Municipal Facility Stormwater Retrofit Design, Charlotte, NC. Project Manager for <br />the identification of methods to reduce impacts of a municipal vehicle maintenance and washing facility <br />on adjacent surface waters through source reduction and modifications to an existing non-functioning <br />filter system. Conducted a feasibility analysis of various source reduction techniques and BMP <br />modifications incorporating site operational restrictions, municipal NPDES phase II compliance <br />requirements, and existing infrastructure conditions. Provided design and prepazation of construction <br />documents for specific improvements including diversion of rooftop runoff directly to stream, <br />construction of rooftop over vehicle washpad, and conversion of fitter system to a staged detention, <br />vertical filter, finishing wetland system <br />Partners Equity Stormwater Improvement, Partners Equity Group, Smithfield, NC. Managed the <br />development of design and permitting for the conversion of an existing wetpond serving a 51 acre <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.