Orange County NC Website
<br />• Proposed design approach for the project(s) and schedule for completion, <br />• Understanding of the area where the project is located, <br />• Rate structure for proposed staff including all sub-contractors, and <br />• Other factors that may be relevant to the project. <br />~, Project Timeline: <br />The timeline for this project is as follows: <br />------------------Process------------------2DDzl-------------- ---2D1~------------ <br />Task a s o n d l j f m a m j a s o n d <br />Task 1 <br />1. BOCC Adoption of Process X <br />2. Draft UDO Outline X <br />3• Ouheach -Countywide Mtgs. (2) <br />4• Joint Board Mtg. <br />5. Consultant RFP Process <br />6• BOCC Update -Approve UDO <br />Outline <br />Task 2 <br />7. Draft Sections of UDO -New <br />Regulations <br />8• Courtesy Review <br />9• Staff/Consultant Coordination - <br />Graphics <br />10. Outreach -Countywide Mtgs. (2) <br />11. plamring Board (PB) Review <br />12. BOCC -Staff Report <br />Task 3 <br />13. Complete First Draft UDO <br />14. Outreach -Countywide Mtgs. (2) <br />15. Courtesy Review <br />16. planning Board Review <br />17. Consultant Final Deliverables <br />1 g• Complete Public Hearing Draft UDO <br />19. BOCC -Staff Report <br />20• Joint BOCC/PB Public Hearing <br />X <br />X <br />XXX <br />X <br />X X <br />- XX <br />- XXX <br />X <br />XX <br />X <br />X X <br />X <br />X X X <br />X X X <br />X <br />X <br />X <br />10/23!2009 <br />