Browse
Search
Agenda - 03-02-2010 - 4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 03-02-2010 - Regular Mtg.
>
Agenda - 03-02-2010 - 4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 3:38:48 PM
Creation date
2/26/2010 8:56:53 AM
Metadata
Fields
Template:
BOCC
Date
3/2/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4k
Document Relationships
2010-008 Planning - Eno River Desper Geoscience Consulting & Education LLC- Surface Water Quality Monitoring
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 03-02-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />Field Parameters <br />• PH using Standard Method 16 423 <br />• Dissolved Oxygen using Standard Method 4500-O-G <br />• Conductivity using EPA Method 120.1 <br />• Temperature using EPA Method 170.1 <br />Laboratory Analytes <br />• Fecal coliform bacteria using Standard Method 9222D <br />• Fecal coliform bacteria using Standard Method 9222D <br />• Chlorophyll a using ASTM Method D37318 or EPA Method 445.0 <br />• Total suspended solids using EPA Method 160.2 <br />• Turbidity using EPA Method 180.1 <br />• Ammonia using EPA Method 350.1 <br />• Total Kjeldahl nitrogen using EPA Method 351.2 <br />• Nitrate/nitrite-nitrogen using EPA Method 353.2 <br />• Total phosphorus using EPA Method 365.1 <br />iii) Should County reasonably determine that Provider has not met the Milestone <br />Dates established in Section 3(a)(ii), County shall notify Provider of the failure to <br />meet the Milestone Date. The County, at its discretion may provide the Provider <br />seven (7) days to cure the breach. County may withhold the accompanying <br />payment without penalty .until such time as Provider cures the breach. In the <br />alternative, upon Provider's failure to meet any Milestone Date the County may <br />modify the Milestone Date schedule. Should Provider or its representatives fail to <br />cure the breach within seven (7) days, or fail to reasonably agree to such modified <br />schedule, County may immediately terminate this Agreement in writing, without <br />penalty or incurring further .obligation to Provider. This section .shall not be <br />interpreted to limit the definition of breach to the failure to meet Milestone Dates. <br />4. Duration of Services <br />a. Term. The term of this Agreement shall be from March 2010 to March 2011. <br />b. Scheduling of Services <br />i) The Provider shall schedule and perform his activities in a timely manner so as to <br />meet the Milestone Dates listed in Section 3. <br />ii) Should the County determine that the Provider is behind schedule, it may require <br />the Provider to expedite and accelerate his efforts, including providing additional <br />resources and working overtime, as necessary, to perform his services in <br />accordance with the approved project schedule at no additional cost to the <br />County. <br />Revised January 2010 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.