Browse
Search
Agenda - 03-02-2010 - 4i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 03-02-2010 - Regular Mtg.
>
Agenda - 03-02-2010 - 4i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 3:23:35 PM
Creation date
2/26/2010 8:53:22 AM
Metadata
Fields
Template:
BOCC
Date
3/2/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4i
Document Relationships
Minutes 03-02-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary <br />Analysis of 5 Years of Projections for 2009-10 School Year -Orange County Schools <br />(The number in brackets [n] is the number of students the projection was ofdcompared to actual membership. A number in parenthesis <br />within the brackets [ (n) ]indicates the projection was low compared to the actual whereas a number not in parenthesis indicates the <br />ro'ection was hi h com aced to the actual. <br /> Year Projection Made for 2009-10 Membership <br /> Actua12009 2004-05 2005-06 2006-07 2007-08 2008-09' <br /> Membershi <br />Elementa 3211 3328 117 3241 30 3223 12 3333 122 3211 0 <br />Middle 1665 1647 18 1618 47 1629 36 1631 34 1628 37 <br />Hi h 2217 2137 80) 2139 78 2177 (40 2224 7 2210 7 <br />D. Student Growth Rate ............................................(Change)..........Pg. 38 <br /> Avera a Annual Growth Rate over 10 Years <br /> Chapel HilUCarrboro <br />School District Orange County <br />School District <br /> 2005 2006 2007 2008 2009 2005 2006 2007 2008 2009 <br />Elements 1.95% 2.03% 1.85% 1.5% 1.72% 1.60% 1.49% 1.84% 1.16% 1.34% <br />Middle 2.41% 2.35% 2.58% 2.03% 1.93% 1.18% 1.42% 1.78% 1.44% 1.53% <br />Hi h 1.95% 2.04% 2.31% 2.21% 1.8% 0.92% 0.98% 1.49% 1.0% 1.38% <br />E. Student /Housing Generation Rate ....................(No Change)...........Pg. 41 <br />SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE STATUS <br />(based on future year Student Membership Projections) <br />CHAPEL HILL/CARRBORO SCHOOL DISTRICT <br />Elementary School District <br />A. Does not exceed 105% LOS standard (current LOS is 99.5%). <br />B. The projected growth rate at this level is expected to increase at a greater rate over the <br />next 10 years. <br />C. Due partially to reduced class size capacities going into effect in 2008 with the opening <br />of Morris Grove Elementary, the projections are showing a need for Elementary School <br /># 11 in 2012-13 by a proj ected overcapacity of 98 students. <br />D. Effective this school year, the kindergarten enrollment date changed from October 16th to <br />August 31St. This policy change resulted in a shorter enrollment period this year and a <br />drop in kindergarten enrollment. This issue is addressed more fully on page 30 of the <br />report. <br />Middle School District <br />A. Does not currently exceed 107% LOS standards (current LOS is 95.4%). <br />ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.