Orange County NC Website
CAPS are not required by the local government to be issued prior to development <br />approvals. Once students generated from Mebane development actually enter the <br />school system, faster enrollment increases would affect projections and may identify CIP <br />needs within 10 years, unless enrollment is balanced by slower growth in other areas of <br />the district. <br />8. Student Generation Rates <br />Following the certification of the 2009 SAPFOTAC report and in accordance with the <br />process outlined in the SAPFO MOUs, the SAPFO Technical Advisory Committee <br />recommended the BOCC adopt the updated Student Generation Rates included in the <br />2007 TischlerBise impact fee analysis. On October 6, 2009, the Orange County Board of <br />Commissioners approved the updated Student Generation Rates, as recommended by <br />the SAPFOTAC. The updated Student Generation Rates become effective with the <br />November 15, 2010 CAPS system update. These new rates generally show higher <br />student generation rates for various housing types. <br />9. Access to Full Report <br />The draft SAPFOTAC report will be posted on the Orange County Planning Department's <br />web site. A letter and the Executive Summary of the report will be sent to all SAPFO <br />partners after this BOCC meeting advising them of the availability of the draft report and <br />inviting comment. <br />It is anticipated the draft 2010 SAPFOTAC report will be brought back to the BOCC for <br />certification at the May 6, 2010 regular meeting. <br />FINANCIAL IMPACT: Current 10-year student growth projections show future needs for <br />additional schools in the CHCCS District. CHCCS Elementary School #11 is projected to be <br />needed in 2012-13. CHCCS Middle School #5 is projected to be needed in 2016-17, and <br />expansion of Carrboro High School is expected to be necessary in 2019-20. <br />Section 7 of the Schools Adequate Public Facilities Memorandum of Understanding (MOU) <br />states, "Orange County will use its best efforts to provide the funding to carry out the Capital <br />Improvement Plan referenced in Section 1 above." <br />RECOMMENDATION(S): The Manager recommends the Board: <br />1. Receive the 2010 SAPFOTAC Annual Report; and <br />2. Authorize the Chair to sign the transmittal letter to SAPFO partners contained in <br />Attachment 1. <br />