Browse
Search
Agenda - 03-02-2010 - 4i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 03-02-2010 - Regular Mtg.
>
Agenda - 03-02-2010 - 4i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 3:23:35 PM
Creation date
2/26/2010 8:53:22 AM
Metadata
Fields
Template:
BOCC
Date
3/2/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4i
Document Relationships
Minutes 03-02-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section I <br />1. <br />2. <br />3. <br />B. Building Capacity <br />Responsible Entity for Suggesting Change -The Planning Directors, School <br />Representatives, Technical Advisory Committee (SAPFOTAC) will receive requested <br />changes that are CIP related and adopted in the prior year. CIP capacity changes will be <br />updated along with actual membership received in November of each year. <br />Other changes will be sent to a `Joint Action Committee' of the BOCC and Board of <br />Education, as noted in the MOU, who will make recommendations and forward changes <br />(on the specific forms with justification) to the full Board of County Commissioners for <br />review and action. These non-CIP changes would be updated in the upcoming November <br />CAPS system recalibration and included in the SAPFOTAC report. <br />Definition- "For purposes of this Memorandum, "building capacity" will be determined <br />by reference to State guidelines and the School District guidelines (consistent with CIP <br />School Construction Guidelines/policies developed by the School District and the Board <br />of County Commissioners) and will be determined by a joint action of the School Board <br />and the Orange County Board of Commissioners. As used herein the term "building <br />capacity" refers to permanent buildings. Mobile classrooms and other temporary student <br />accommodating classroom spaces are not permanent buildings and may not be counted in <br />determining the school districts building capacity." <br />Standard for: <br />Chapel Hill Carrboro School District <br />The original certified capacity for each of the <br />schools was certified by the respective <br />superintendent and incorporated in the <br />initialization of the CAPS system (Chapel Hill <br />Carrboro School District Apri129, 2002 - <br />Base) <br />Capacity changes were made each year as <br />follows: <br />Standard for: <br />Orange County School District <br />The original certified capacity for each of the <br />schools was certified by the respective <br />superintendent and incorporated in the <br />initialization of the CAPS system (Orange <br />County School District Apri130, 2002 -Base) <br />Capacity changes were made each year as <br />follows: <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.