Browse
Search
Agenda - 02-22-2010 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 02-22-2010 - Joint Mtg. Hills. BOC
>
Agenda - 02-22-2010 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 4:24:08 PM
Creation date
2/18/2010 4:24:13 PM
Metadata
Fields
Template:
BOCC
Date
2/22/2010
Meeting Type
Public Hearing
Document Type
Agenda
Document Relationships
Minutes 02-22-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The land area in the Upper Eno watershed (straight line distance) within <br />one -half mile of the normal pool elevation (NPE), or nearest available <br />contour line used for the calculation, of an existing Class I or Class li <br />reservoir or proposed water supply reservoir designated for protection <br />or the ridgeline of the sub - watershed, whichever is less, and <br />• The land area within one -half mile on each side for an upstream <br />distance of 2.5 miles (straight line distance) of any fifth order or higher <br />stream flowing into a Class I reservoir, or the ridgeline of the sub - <br />watershed, whichever is less, and <br />• The land area within one -half mile on each side of a fourth order or <br />higher stream flowing between any Class II and Class I reservoir; and <br />• The land area within one -half mile on each side for an upstream <br />distance of 1.5 miles (straight line distance) of a third or fourth order <br />stream flowing directly into any Class I reservoir: and <br />• The land area within one -half mile on each side for an upstream <br />distance of 1.0 mile (straight line distance) of a third or fourth order <br />stream flowing into a fourth order or higher stream that is within 1.0 <br />miles (straight line distance) of a Class I reservoir: and <br />• Any isolated areas within the critical area boundary. <br />• Areas designated as Transition Areas on the Land Use Element Map of <br />the Orange County Comprehensive Plan are excluded from designation <br />as a Critical Area, except for land areas located within one -half mile <br />from the normal pool elevation of a Class I reservoir. <br />The designation of "Protected" applies to areas of watersheds classified as <br />WS -II, WSIII, or WS -IV outside of areas designated as "Critical Area." <br />
The URL can be used to link to this page
Your browser does not support the video tag.