Orange County NC Website
01 <br />0 <br />Upper Eno "Protected" <br />Upper Eno "Critical Area" <br />buffer width shall be calculated using <br />whichever is greatest. <br />Method A, but shall not be less than 100'. <br />Water <br />• No new treatment system will be <br />New septic tanks, pump tanks and their <br />Supply /Sewage <br />permitted where effluent disposal occurs <br />appurtenances shall be located outside of any <br />Disposal . <br />on a separate lot from the source of <br />stream buffers and at least 100 feet from a <br />wastewater generation; provided, <br />perennial or intermittent stream as shown on <br />however, off -site systems shall be <br />the USGS Quadrangle maps, and at least 150 <br />permitted when located in a Flexible <br />feet from a reservoir. <br />Development subdivision approved in <br />New nitrification fields shall be located outside <br />accordance with Section IV -B -10 of the <br />of any stream buffers and at least 100 feet <br />Orange County Subdivision Regulations. <br />from a perennial or intermittent stream as <br />• New septic tanks and their nitrification <br />shown on the USGS Quadrangle maps, and <br />fields shall be located outside of any <br />at least 300 feet from a reservoir. <br />stream buffers and at least 100 feet from <br />Water supply and sewage treatment systems <br />a perennial or intermittent stream as <br />shall be limited to individual wells and septic <br />shown on the USGS Quadrangle maps. <br />systems or individual on -site alternative <br />disposal systems; provided, however, off -site <br />systems shall be permitted when located in a <br />Flexible Development subdivision approved in <br />accordance with Section IV -B -10 of the <br />Orange County Subdivision Regulations. <br />