Orange County NC Website
co <br />Upper Eno "Protected" <br />Upper Eno "Critical Area" <br />residential uses outside of Commercial <br />and /or Industrial Nodes as designated in <br />the Land Use Element of the <br />Comprehensive Plan (BMPs cannot be <br />used to satisfy watershed impervious <br />surface requirements); <br />AND <br />• On -site infiltration of the first inch of <br />stormwater runoff; <br />AND <br />• A limit of 1,151 acres of non - residential <br />use throughout the Upper Eno Protected <br />Watershed (5.0 %). <br />Undisturbed Area <br />• As required pursuant to an approved <br />• The area necessary to meet impervious <br />grading permit or erosion control plan. <br />surface requirements shall remain <br />undisturbed during the construction process. <br />• The area to remain undisturbed shall include <br />portions of the lot utilized for stormwater <br />infiltration. <br />• All clearing limits shall be clearly marked and <br />observed. <br />The buffer width shall be as calculated <br />• The buffer width adjacent to streams shall be <br />Minimum Stream <br />Buffer Width <br />using Method A [defined in Section <br />the width calculated using Method A [defined <br />6.23.7], or 150', whichever is less, except <br />in Section 6.23.7]. <br />where density exceeds 1 du /acre and <br />• The same method shall be used to calculate <br />impervious surface exceeds 12 %. <br />the buffer around the reservoir itself. New <br />• Where density exceeds 1 du /acre and <br />structures shall be located at least 150' from <br />impervious surface exceeds 12 %, the <br />the reservoir or outside of the stream buffer, <br />co <br />