Browse
Search
Agenda - 02-22-2010 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 02-22-2010 - Joint Mtg. Hills. BOC
>
Agenda - 02-22-2010 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 4:24:08 PM
Creation date
2/18/2010 4:24:13 PM
Metadata
Fields
Template:
BOCC
Date
2/22/2010
Meeting Type
Public Hearing
Document Type
Agenda
Document Relationships
Minutes 02-22-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
co <br />Upper Eno "Protected" <br />Upper Eno "Critical Area" <br />residential uses outside of Commercial <br />and /or Industrial Nodes as designated in <br />the Land Use Element of the <br />Comprehensive Plan (BMPs cannot be <br />used to satisfy watershed impervious <br />surface requirements); <br />AND <br />• On -site infiltration of the first inch of <br />stormwater runoff; <br />AND <br />• A limit of 1,151 acres of non - residential <br />use throughout the Upper Eno Protected <br />Watershed (5.0 %). <br />Undisturbed Area <br />• As required pursuant to an approved <br />• The area necessary to meet impervious <br />grading permit or erosion control plan. <br />surface requirements shall remain <br />undisturbed during the construction process. <br />• The area to remain undisturbed shall include <br />portions of the lot utilized for stormwater <br />infiltration. <br />• All clearing limits shall be clearly marked and <br />observed. <br />The buffer width shall be as calculated <br />• The buffer width adjacent to streams shall be <br />Minimum Stream <br />Buffer Width <br />using Method A [defined in Section <br />the width calculated using Method A [defined <br />6.23.7], or 150', whichever is less, except <br />in Section 6.23.7]. <br />where density exceeds 1 du /acre and <br />• The same method shall be used to calculate <br />impervious surface exceeds 12 %. <br />the buffer around the reservoir itself. New <br />• Where density exceeds 1 du /acre and <br />structures shall be located at least 150' from <br />impervious surface exceeds 12 %, the <br />the reservoir or outside of the stream buffer, <br />co <br />
The URL can be used to link to this page
Your browser does not support the video tag.