Browse
Search
Agenda - 02-18-2010 - Attachment 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 02-18-2010 - Joint Mtg. - Hills. BOC
>
Agenda - 02-18-2010 - Attachment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 3:10:45 PM
Creation date
2/15/2010 2:19:51 PM
Metadata
Fields
Template:
BOCC
Date
2/18/2010
Meeting Type
Municipalities
Document Type
Agenda
Agenda Item
Attachment 3
Document Relationships
Minutes 02-18-2010
(Superseded by)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Iii <br /> Alternatives - Elizabeth Brady Road Attachment 3 <br /> -� Existing Requests/Projects <br /> 1 • Update and modernize 1-85 <br /> interchange 165 on NC 86 <br /> — 2 • Update the Feasibility Study for <br /> WMgRGgRETLN the widening of S Churton Street <br /> (TIP R-2825) and construct <br /> 6 <br /> recommended improvements <br /> FAR�AU�TW 3 • Conduct a Feasibility Study for <br /> 7 the construction of Orange Grove <br /> I� Street extension to US 70 <br /> Business <br /> t <br /> 70A 4 • Conduct a Feasibility Study for <br /> 4 the alignment of Eno Mountain <br /> y�N Road and Mayo Street (TIP U- <br /> i 3436) and construct <br /> U recommended improvements <br /> .,���uo • Operational support funding for <br /> an in town circulating bus route <br /> (not mapped) <br /> o� New Requests <br /> • Designate a NC 86 Bypass (not <br /> mapped) <br /> 86 <br /> `' • Enhanced signage East, West, <br /> and North of Hillsborough to direct <br /> through traffic to use the US 70 <br /> o� connector and interstates (not <br /> mapped) <br /> •A Downtown Traffic Demand <br /> .. Management and efficiency <br /> assessment (not mapped) <br /> • <br /> 5 •Assess the impacts and <br /> viability of extending US 70 A west <br /> W r_ to connect with Faribault Lane <br /> • Community railroad crossing <br /> �uP,r�s,QyF� assessment (not mapped) <br /> 6 & 7 •Assess the condition of the <br /> I2- Eno River bridge (6) and railroad <br /> ' bridge (7) on South Churton <br /> Street <br /> (, I I <br /> Streets C3 Existing Requests/Projects N <br /> 1 inch=2,000 feet <br /> Streams C3 New Requests 1 o 2,000 <br /> Feet <br /> . u City Limits <br /> ETJ Orange County Planning and Inspections Department <br /> GIS Map Prepared by Brian Carson February 10,2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.