Orange County NC Website
• Iii <br /> Alternatives - Elizabeth Brady Road Attachment 3 <br /> -� Existing Requests/Projects <br /> 1 • Update and modernize 1-85 <br /> interchange 165 on NC 86 <br /> — 2 • Update the Feasibility Study for <br /> WMgRGgRETLN the widening of S Churton Street <br /> (TIP R-2825) and construct <br /> 6 <br /> recommended improvements <br /> FAR�AU�TW 3 • Conduct a Feasibility Study for <br /> 7 the construction of Orange Grove <br /> I� Street extension to US 70 <br /> Business <br /> t <br /> 70A 4 • Conduct a Feasibility Study for <br /> 4 the alignment of Eno Mountain <br /> y�N Road and Mayo Street (TIP U- <br /> i 3436) and construct <br /> U recommended improvements <br /> .,���uo • Operational support funding for <br /> an in town circulating bus route <br /> (not mapped) <br /> o� New Requests <br /> • Designate a NC 86 Bypass (not <br /> mapped) <br /> 86 <br /> `' • Enhanced signage East, West, <br /> and North of Hillsborough to direct <br /> through traffic to use the US 70 <br /> o� connector and interstates (not <br /> mapped) <br /> •A Downtown Traffic Demand <br /> .. Management and efficiency <br /> assessment (not mapped) <br /> • <br /> 5 •Assess the impacts and <br /> viability of extending US 70 A west <br /> W r_ to connect with Faribault Lane <br /> • Community railroad crossing <br /> �uP,r�s,QyF� assessment (not mapped) <br /> 6 & 7 •Assess the condition of the <br /> I2- Eno River bridge (6) and railroad <br /> ' bridge (7) on South Churton <br /> Street <br /> (, I I <br /> Streets C3 Existing Requests/Projects N <br /> 1 inch=2,000 feet <br /> Streams C3 New Requests 1 o 2,000 <br /> Feet <br /> . u City Limits <br /> ETJ Orange County Planning and Inspections Department <br /> GIS Map Prepared by Brian Carson February 10,2010 <br />