Orange County NC Website
DRAFT Date Prepared: 02/05/10 <br />Date Revised: 02/10/10 <br />BOCC Meeting Follow-up Actions <br />(Individuals with a * by their name are the lead facilitators for the arouu of individuals responsible for an item) <br />Meeting Task Target Person(s) Status <br />Date Date Responsible <br />2/2/10 Bring back revised abstract and draft letter related to Orange 4/6/2010 Karen Lincoln To be revised and brought back <br /> County supporting NCDOT's application for Southeast Craig Benedict for BOCC approval <br /> Hi h S eed Rail Fundin <br />2/2/10 Review the possibilities and qualifications necessary fora 4/6/2010 Frank Montes de To be reviewed and brought <br /> new position for the Emergency Medical Services Oca back to BOCC for consideration <br /> Committee and brin back item for BOCC consideration Annette Moore <br />2/2/10 Follow-up on comments and issues raised by the Board as 5/6/2010 Gayle Wilson Comments and issues to be <br /> part of Solid Waste Plan and the Solid Waste Work Group's Willie Best considered as part of future <br /> work and incorporate into next steps/efforts/etc. discussions/work <br />2/2/10 Provide actual cost figures related to the Neighborhood/ 5/6/2010 Gayle Wilson Cost figures to be provided <br /> District model for solid waste convenience centers Willie Best <br />2/2/10 Ensure that minutes for Solid Waste Work Group are posted 4/6/2010 Gayle Wilson Minutes to be posted <br /> on the County website Willie Best <br />2/2/10 Make plans for discussion of Solid Waste Work Group's 3/25/2010 Gayle Wilson Planning for AOG meeting to <br /> effort at the March 25, Assembly of Governments meeting Willie Best occur with focus on two areas <br /> with plans to focus on the participants' commitment to 1)the <br /> 61 % recycling goal and 2) contracting with Durham as a <br /> rou for use of the solid waste transfer station <br />?/2`10 fiend link for Comprehensive Transportation Plan survey to 2/>/2010 Karen Lincoln DONE <br /> BOCC Donna Baker <br />2/2/10 Follow-up on issues and questions raised on Comprehensive 4/20/2010 Karen Lincoln Follow-up to occur <br /> Transportation Plan, including whether the Highway 86 Craig Benedict <br /> corridor designation assumed the Elizabeth Brady Road <br /> extension and NCDOT's rationale/thinking for designating <br /> Highway 86 as a corridor <br />H <br />1 <br />3 <br />n <br />-a- <br />a <br />n <br />--~- <br />3 <br />