Browse
Search
Agenda - 02-16-2010 - 4f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 02-16-2010 - Regular Mtg.
>
Agenda - 02-16-2010 - 4f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2010 3:00:55 PM
Creation date
2/12/2010 3:00:54 PM
Metadata
Fields
Template:
BOCC
Date
2/16/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4f
Document Relationships
2010-120 AMS - Coulter Jewell Thames, PA - Amendment to Contract for greenway trail at the Twin Creeks Park
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 02-16-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />STATE ox' NORTH CAROLINA <br />DEPARTMENT OF fiRANSPORTATION <br />BEVERLY EAVES PERDUE <br />Gov~uvox <br />8 February 2010 <br />MEMORANDUM TO: <br />FROM: <br />SUBJECT: <br />Local Municipalities <br />J.M. Mills, PE <br />Division Engineer <br />EUGENE A. CONTi, JR. <br />SECRBTARY <br />ARRA Project Requirements-Local Municipal Responsibilities <br />NCDOT Construction Manual <br />• Online at: <br />http://www.ncdot.gov/doh/operations/dp_chief eng/constructionunut/formsmanuals/construction/ <br />Contract Administration <br />General Requirements (Attachment 1, Construction Manual, Division 1 General Requirements section <br />pg. 1-10) <br />• Prime Contractor <br />Prequalified bidders on NCDOT list only <br />• Subcontractors <br />Request for Subcontract (Attachment 1, Construction Manual, Records & Report section pg. R- <br />21s-z21) <br />Inspection <br />• Must be performed whenever Contractor is working at alI times <br />• Inspector's Daily Report ' <br />• Project Diary <br />(Attachment 2, Construction Manual, Records & Report section pg. 207-210) <br />Tes <br />• Minimum Testing requirements <br />Found online at: <br />Search by material type <br />• Independent sampling (Quality Assurance testing) <br />Material & Test Unit staff <br />Guardrail, steel, metal poles, torque on bolts <br />Resident Engineer staff <br />Concrete, asphalt <br />DBE Compliance/Trackina <br />• Submit payments monthly or at project completion if only one invoice is submitted to RE to enter <br />into DBE tracking system <br />• Changes/modif cations/replacements must be approved <br />
The URL can be used to link to this page
Your browser does not support the video tag.