Orange County NC Website
5 <br />~~~ ~ <br />~: <br />.. Coulter~Jeweli Thames, Pa <br />111 WEST MAIN STREET <br />DURHAM, NORTH CAROLINA 27761 <br />p919.682.0368 f919.688.5646 <br />~~ IuI1 fiiiig Cs; laB !' 4lu i e <br />LETTER OF AMENDMENT TO AN EXISTING CONTRACT <br />made this 7th day of January, 2010 <br />To The OWNER <br />Orange County -Asset Management and Purchasing Services <br />PO Box 8181 <br />Hillsborough, NC 27278 <br />Attn: Leff Thompson <br />By The SITE CONSULTANT <br />Coulter Jewe[1 Thames, P.A. <br />1 [ 1 West Main Street <br />Durham, North Carolina 27701 <br />For Landscape Architecture and Civil Engineering Services <br />For additional services related to the construction administration and inspection of the greenway trail at the <br />Twin Creeks District Park located in Gan'boro, North Carolina. <br />Description <br />This proposal is for additional Civil Engineering services related to the construction administaration and <br />inspection of the greenway trail at the Twin Creeks District Park. During the design phase of the project, <br />Orange County was able to obtain ARRA funding for a portion of the trail construction. A requirement of <br />receiving ARRA funding for the project is that fitl[ time inspection services be provided, and that <br />construction phase services be provided as if the project were a NCDOT project. The ARRA funding also . <br />requites additional state and federal reporting requirements be met during construction. The construction <br />phase services requited by ARRA exceed the scope of construction phase services in the design contract for <br />the greenway trail. , <br />This proposal does not include NCDOT certified testing of construction materials. Orange County will be <br />responsible for contracting with a certified testing firm to provide construction material testing as required <br />by NCDOT requirements. The construction material testing required includes, but is not timited to, soil <br />density tests, stone density test, concrete sampling and tests. <br />ADDITIONAL SCOPE OF BASIC SERVICES: <br />t Construction Phase Services <br />L.0 ( Provide a resident project representative who will be at the site at times construction crews are <br />working who will be responsible for preparing and maintaining all written documentation <br />necessary to satisfy NCDOT to comply with A.R.R.:4, funding procedures for the Twin Creeks <br />Greenway Project. <br />L02 Prepare daily reports, journals and Togs of all construction activities and construction work <br />performed in accordance with NCDOT guidelines. <br />1.03 Document the receipt of atl materials, equipment and machinery delivered to the site. <br />