Orange County NC Website
~\~\~ <br /> <br />December 9, 2009 <br />ARCHITECTS • ENGINEERS P L A N N E R S <br />GLENN D. CORLEY, AIA <br />Chairman <br />KENNETH E. REDFOOT, AIA, LE£D AP <br />President <br />MICHAEL L. HAMMERSLEY, PE <br />Farther <br />ANDREW R. CRUICKSHANK, AEA, LEED AP <br />Partner <br />• DAVED M..TAYLOR, AEA, LEFT1 AP <br />Partner <br />KIMBERLY D. BE7FF, AIA, LEED AP <br />• Associate <br />LAURENCE W. BLmICH, AIA <br />Associate <br />EiAItRY M. JENS£N ,. . <br />Associate <br />KENNETIE E. SMITEi <br />Associate <br />PO Box 2368 <br />. Chapel Hill, NC 27515-2368 <br />222 Cloister Court <br />Chapel Hill, NC 27514-ZZ12 <br />YEARS <br />-Design & Construction <br />Construction Documents: <br />Bidding Phase: <br />Construction Administration: <br />{919} 401-8586 Telephone <br />(9I9}493-7306 Fax <br />www.corteyiedfootzaek.coEn <br />- Reece, Noland & McEkath, Irlc: Mechanical, Electrical, and <br />Plumbing .Engineers . . <br />Our fee tar Basic Services for the scope of work outlined above, with the <br />consultant team as listed above, i5 $6.1;300. <br />. Basic Services design phases, with associated fees, shall be as follows: <br />CORLEY REDFOOT ZACK <br />MsPamela K. Jones, Director <br />Asset Management & Purchasing <br />Orange County <br />P. O. Box 8181 <br />HiILsborough, NC 27278 <br />RE: Phase II -John M. Link, Jr., Building Renovation Project <br />BOCC Meeting Roorn and Support Spaces <br />Dear Ms. Jones: <br />Corley Redfoat Zack, Inc., is pleased to subunit to you our fee proposal to <br />provide professional design services for the above-referenced pro}ect. <br />• Nov that the Phase I renovations are complete, it is important to begin the <br />design work required for Phase II in anticipation of the proposed Phase II <br />completion date of December 31, 2010. <br />The scope. of work for Phase II includes renovations to the ground floor of <br />.the existing Link_ Building to create a new Board of County <br />Commissioners' meeting room and support areas, new Mens and Womens <br />toilets rooms, and the work necessazy to complete the fire suppression <br />Sy5teII1. <br />Our design team will include the following consultants: <br />70% $42,910 <br />5% 3,065. <br />25°° 15,325 <br />100% $61,300 <br />3 <br />