Browse
Search
Agenda - 02-16-2010 - 4e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 02-16-2010 - Regular Mtg.
>
Agenda - 02-16-2010 - 4e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2010 2:59:52 PM
Creation date
2/12/2010 2:59:49 PM
Metadata
Fields
Template:
BOCC
Date
2/16/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4e
Document Relationships
2010-031b AMS - Corley, Redfoot, Foley, Inc. - Contract Award for Phase II, Architectural Services Link Government Services Center
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 02-16-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />AIA Document B151-1997 <br />Phase II -John M. Link, Jr., Building Renovation <br />ARTICLE 12 OTHER CONDITIONS OR SERVICES <br />page 16 <br />12.1 The Designer's ability to adhere to the schedule proposed by the Owner is predicated upon <br />timely receipt of reviews and approvals from the Owner, authorized agencies or agents of the <br />Owner, consultants or contractor hired by the Owner and local or state agencies having <br />jurisdiction over the project. It is CRTs understanding that a proposed completion date iYt the <br />fourth quarter of 2010 is anizcipated. <br />12.2 CONSTRUCTION PHASE: <br />During the construction phase of the work, the term "INSPECTION" shall be defined as follows: <br />"Inspection shall consist of visual observations of materials, equipment or construction work far <br />the purpose of ascertaining that the work is in substantial conformance with the Contract <br />Documents and with the design intent. Others shall not rely upon such inspection as <br />acceptance of the work, nox should it be construed to relieve the Contractor in any way from <br />the obligations and responsibilities the Contractor assumes under the construction contract. <br />Specifically, but without limitation, inspection by the Design Professional shall not require the <br />.Design Professional to assume responsibilities for the means and methods of construction, nor <br />for safety on the jobsite." <br />Add the following paragraph to Article 2.6.5: <br />"Site. visits shall be made weekly,: for the estimated seven (7}-month construction period and are <br />included under Basic Services: if additional trips are required for whatever reason, these trips <br />shall :be deemed as Additional Services and will be billed at hourly rates (see 11.3.1}. If the <br />completion date of the project is extended, Additional Services will be billed at hourly rates." <br />12.3 Services not included: <br />a. Printing, postage, reproduction (billed at cost} <br />b. Topographic or boundary surveys <br />c. Subsurface investigation, soil, concrete and soil testing during construction <br />d. Legal fees <br />e. lenderings or models <br />f. Off-site utility design . <br />g. Town permitting or approval process fees. <br />h. Revising.design and details for reduction of cost as required by the Owner or Contractor <br />after each phase of design has been started or completed. . <br />i. Cost estimates or guarantee of any cost of the project. <br />j. Mileage C~ $ 0.55/mile. <br />Link-conZ2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.