Orange County NC Website
<br />ATTACHMENT id3 <br />BUCKHORN EDD - MEBANE SERVICE AREA <br />COST ESTIMATE SUMMARY <br />PHASE 1 (EXISTING) -Gravelly Hill Middle School- and Eurosport Soccer <br />Center <br />(Completed 2007) <br />a. Buckhom EDD Sewer Phase I -100 acres <br />1. Gravelly Hill 205 gpm Sewage Lift Station (upgradeable to 325 <br />gpm, 7700 Linear Foot of 6" Sewage Force Main <br />(Pumping/Releasing to Petro 8" Gravity Sanitary Sewer) 100 <br />Linear Foot of 8" Gravity <br />2. Cost: approximately $1,450,000, including engineering and <br />design <br />b. Buckhom EDD Water Phase I -100+ acres <br />1. 7700 Linear Foot of 12" Water Main (Connects to Mebane System <br />at Petro) <br />2. Cost: approximately $550,000, including engineering and design <br />work for Central Efland and North Buckhorn <br />