Browse
Search
Agenda - 01-21-2010 - 6e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 01-21-2010 - Regular Mtg.
>
Agenda - 01-21-2010 - 6e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2010 3:00:57 PM
Creation date
1/15/2010 3:00:54 PM
Metadata
Fields
Template:
BOCC
Date
1/21/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6e
Document Relationships
Minutes 01-21-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewer Phase 1 <br />Exlsting Sewer <br />Syste!>7 with <br />Water Phase 3 Sewer Phase 4 Transmission <br />Proposed 7,000 LF Propesed 2,080 LF to the Tawn of <br />of 16" Water Main of 8" Gravity Sewer Hillsborough <br />(Service Area 200 iService Area 88 <br />Acres) Acresi <br />Water Phase 2 <br />Proposed 11.000 LF ~ Sewer Phase 3 <br />16" Water Main ~ Proposed 7,200 LF <br />(Service Area 5G6 '~~ of 8" Gravity Sewer <br />Acresi iceArea 158 <br />To City of Mebane e'~+- <br />Waterand Sewer <br />System Sewer Phase 2 <br />Proposed 7,600 LF <br />of 10" Gravity Sewer Phase 1 <br />Sewer (Service Existing Sewer <br />_ _ _ _ ~ Area 446 Acres) Service Area <br />Sewer Phase 5 : 95.50 Acres <br />Proposed 12,100 LF Sewer Phase 1 r ~' <br />t <br />of 12" Gravity Sewer Existing 8" + - <br />(Service Area 423 Gravity Sewer ` ' <br />Acres) ~ <br />n <br />Sewer Phase 1 ae.,~, ~ _ -- - - - - -_ _ _ <br />Existing City of ~. ~s„~,~,,~_ : ~, <br />Mebane = s ~'- <br />Southeastern Water Phase 1 <br />Regional Pump Sesver Phase ' Existing 12" <br />Station Existing 6" Force Water Main Water Phase 3 <br />Sewer (Service Area Proposed 3,300 LF <br />(Abandcned in Sewer Phase 2 446 Acres) of 12" Water Main <br />Sewer Phase ?} Proposed 20,000 ..,,__ (Service Area 104 <br />LF of 8" - 10" Sewer Phase 1 Acres) <br />Sewer Phase 5 Force Sewer to Existing Gravelly Hill Pump Station <br />10,380 LF of 10" Mebane Present Capacity 205 G.P.M. <br />Force Sewer Southeastern Ultimate Capacity. s25 G.P.M. Sewer Phase 4 <br />(Abandoned) Pump Station Proposed Gravelly Hill Pump Station No 2 <br />Initial Capacity 125 G.P.M. <br />Sewer Phase 3 Ultimate Capactyy 1i5 c pnn <br />Gravelly Hill Pump Station Replacement <br />Ultimate Capacity: 700 G.P.M. Proposed 2.800 LF of 4" Force Sewer <br />TYPe~ Built-In-Place (Service Area 65 Acres) <br />Legend BUCKHORN - MEBANE EDD N Map produced by Summit Conaulfing Engineers <br />~v' a EDD Water and Sewer ~ tooo corporate Drive, sine log <br />All Phases A Millaborough, NC 27278 <br />Voice: (819) 732-3893 Fax (919) 732-6876 <br />EDD Future t nch equals 70o feet www.summit-engineeccom <br />D <br />A <br />N <br />rr <br />n <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.