Orange County NC Website
Proposed Sewer <br />Proposed Sewer Service Area <br />Service Area 222 Acres <br />423 Acres 185 <br />T <br />Existing. GravKy Sewer to <br />Proposed 42,100 LF City of Mebane lndustria! <br />w of 42" Gravity Sewer Drive Pump Station <br />? Estimated Cost. <br />z ~ <br />0 <br />U ~ <br />Existing City <br />of Mebane 9,660 LF of 8" -10" _ <br />Southeastern Force Sewer From ~ <br />Regional Existing Gravelly Hill Z <br />Pump Station Pump Station <br />(Installed in Phase 2) <br />~ 10,380 LF of 10" <br />~ Force Sewer <br />` I (Abandoned) . <br />. • <br />t e ..,r <br />--~-.._ <br />Q Sewer service Area <br />t' Proposed Sewer Manhole Phase 5 N <br />Map produced b1' Summit Consulting Engineers <br />Proposed Gravity Sewer <br />Proposed Force sewer FUTURE BUCKHORN EDD 1000 Corporate Drive, suite 101 <br />Higsborough, NC 27278 <br />~~~~ Face ~"~ Voice: (919) 732-3883 Fax: (919) 732676 <br />t3dsting Sewer Pump Station Sanitary Sewer 1 inch equals 1,200 feet www.summit~ngineercom <br />Future EDD <br />01 <br />n <br />7- <br />3 <br />m <br />cr+ <br /> <br />